In the spring of 1870, a compressed-air worker employed by the Keystone Bridge Company descended through the airlock at the top of the east pier caisson, making his way down to the working chamber at the bottom of the Mississippi River. The river above him at that spot ran sixty feet deep. The caisson had already sunk forty feet into the riverbed. From where the man stood to the surface of the water was roughly one hundred feet.

The air pressure in the chamber was set high enough to keep the Mississippi out, which meant the man was breathing air compressed to nearly twice the atmospheric pressure he had woken up to that morning on the riverbank. He had been assigned a four-hour shift. He shoveled sand, clay, and gravel from beneath the cutting edge of the caisson so that the steel box could sink deeper into the riverbed toward the limestone layer 136 feet below the river’s surface, the stratum that engineer James Eads had determined to be the only acceptable foundation for what he was building. When the shift ended, the man climbed back up through the airlock.
The pressure equalized in the steel shaft while he waited. He reached the surface. He walked back to the camp. By the time he reached his bed, his knees had stiffened.
The pain came from inside the joints, not a surface pain, no bruise or wound or strained muscle. It came from within the joint itself. Pressure building where pressure should not exist, and the pain was so intense that the men who suffered it could not stand upright. They bent over completely.
They bent the way a person bends when pain forces the search for a position of relief, though in this case no position brought relief. The workers in the caissons of the Eads Bridge called it “the bends” because of what it did to their bodies, and that name is what stuck in the medical literature, the only record most of them left behind. The man bending over his bed in St. Louis in 1870 was one of 119 workers who contracted decompression sickness in the caissons under the Eads Bridge.
Twelve of those men did not recover. Others suffered permanent neurological damage, partial paralysis, loss of vision, difficulty speaking. The rest recovered as much as the medicine of the 1870s allowed, which was not complete recovery in every case, and then returned to the caissons, or moved on to other work, or went home to whatever had been waiting for them before the bridge company came to town looking for men who could work in compressed air. Their names are in the medical report published by the bridge physician in 1871.
Their names are not on the bridge. The bridge is still there. It spans the Mississippi at St. Louis at a point where the river reaches sixty feet deep in the main channel, carrying a current that has flowed without interruption for ten thousand years.
It has stood there since July 4, 1874. It is made of steel at a time when no one had ever built a major bridge of steel before. The engineers who said it was impossible were not wrong to doubt, because the evidence against it was real. And the man who built it anyway was building on confidence in his own calculations rather than reliance on precedent.
That man had no formal engineering degree. He had spent twenty years raising sunken steamboats from the bottom of the Mississippi, learning what the river was willing to teach. He was not supposed to be able to build this bridge. He built it anyway, and the men who made it possible entered the working chambers beneath the riverbed and breathed compressed air until the caissons reached the bedrock, and twelve of them never came back.
This is the story of how James Buchanan Eads built the bridge that bears his name, and the story of the men who went down into the earth beneath the Mississippi to make the foundations solid, and the story of what the bridge cost in money and in lives, and why the money was recorded and the lives were not. To understand what it meant to build a bridge across the Mississippi at St. Louis in 1867, you have to understand what St. Louis was and what crossing the river had come to cost.
St. Louis stood on the west bank of the Mississippi at the river’s confluence where the Missouri joins from the northwest and the Ohio flows in from the east. It was, geographically, the most important crossroads in North America. Everything that moved between the eastern states and the interior of the continent passed through or near St.
Louis. The fur trade passed through St. Louis. Lewis and Clark departed from St.
Louis. Settlers heading west in the decades before the Civil War crossed the Mississippi at or near St. Louis. Grain, livestock, and raw materials from the Great Plains moved east through St.
Louis. Manufactured goods from the eastern factories moved west through it. All of it crossed the river by ferry, or by ice bridge in winter when the river froze enough to bear weight. Not every winter produced ice thick enough to be reliable.
There was no bridge. That was not an oversight. The Mississippi at St. Louis presented engineering challenges that had not been solved before, because the tools to solve them did not exist.
The river was wide enough that any crossing required spans that exceeded any previous attempt. The current was strong enough to make construction in the water dangerous and difficult in ways traditional bridge-building methods were not designed to handle. The riverbed was soft to great depth, with layers of sand, clay, and gravel extending a hundred feet or more below the surface before reaching the limestone bedrock that any solid foundation required. The river was one of the busiest commercial waterways in the country, and the steamboat operators who dominated that traffic had a strong financial interest in keeping the river free of obstructions, including bridge piers.
The railroads had been trying to solve the problem from the east. By the mid-1860s, half a dozen railroad lines had reached the east bank of the Mississippi opposite St. Louis. They carried freight to the riverbank, then transferred it to ferries, cut across 1,500 feet of water, and loaded it onto trains on the Missouri side.
That transfer cost time and money at every crossing. It exposed cargo to weather damage. It created bottlenecks that slowed the entire railroad network. A locomotive that had come from New York or Philadelphia or Boston without stopping except for fuel and water sat at the Mississippi bank for hours while its load was unloaded, ferried, and reloaded.
Meanwhile, Chicago had no river to cross. The railroads through Chicago ran east and west without interruption. Goods moved through Chicago faster and cheaper than goods that had to be disassembled and reassembled at the Mississippi. That commercial advantage compounded over the years.
The merchants of St. Louis watched their city lose ground to a competitor three hundred miles to the north. The bridge was not merely an engineering ambition. It was a matter of survival.
The city had been discussing a bridge since the 1830s. Those discussions had produced nothing but committees, engineering studies, public debates, and legislative sessions, without any tangible result. The river was too wide, the channel was too deep, the current was too strong, and the steamboat interests had broad influence. Every proposal died in the gap between what the city needed and what any engineer of that era believed could be done.
What changed in 1867 was the arrival of James Eads. James Buchanan Eads was born in 1820 in Lawrenceburg, Indiana. His family moved to St. Louis when he was thirteen, after his father died and left the family without resources.
In St. Louis, he found work as a clerk aboard a steamboat on the Mississippi. He was not a boy who grew up expecting to build anything. He was a boy who needed work.
On the river, he learned the river. He learned it not from maps and surveys but from the water itself, from the difference between the currents at the surface and at the bottom of the channel, from the behavior of the sandbars that shifted with every flood season, from the way the river moved and what it carried and where it deposited. He learned the river by being on it and in it for years, and his knowledge was not theoretical. It was the kind of knowledge that comes from working on something long enough to understand what it actually does rather than what the books say about it.
In 1842, at age twenty-two, he invented a diving bell. It was a simple device, an open-bottomed vessel that trapped a pocket of breathable air at the work site when lowered to the riverbed. He used it to descend to the wrecked steamboats that littered the bottom of the Mississippi to recover cargo that insurance companies were willing to pay to retrieve. The river was full of wrecked steamboats.
Every storm season, every boiler explosion, every navigational error, every collision added more. The cargo inside them was valuable. And the men who could reach it were few. Eads built a company based on salvage operations.
He designed better salvage vessels, more efficient recovery equipment, and more capable systems for working at depth in running water. By the time the Civil War began, he was forty years old and had accumulated twenty years of practical experience working in and on the Mississippi that no university-trained engineer came close to matching. He understood the river’s currents, its bottom layers, its seasonal behavior. He understood it as an environment in which skilled work could be done if the work was designed properly.
When the war broke out, the Union Army needed gunboats to control the western rivers. The War Department approached Eads because he was the man who knew those rivers. He had never designed a military vessel before. He proposed seven armored gunboats and agreed to deliver them within one hundred days.
He built them in forty-five days. The gunboats took part in the Union victories at Fort Henry, Fort Donelson, and Island Number Ten. The western river campaign, which those gunboats made possible, opened the interior of the Confederacy to Union forces a full year before Grant began his campaign at Vicksburg. After the war, Eads was a man who had proven his ability to solve large, complex engineering problems in difficult river environments.
When the Illinois and St. Louis Bridge Company was organized in 1867 to finance a crossing of the Mississippi and offered him the position of chief engineer, he accepted. He was forty-seven years old. He had never built a bridge before.
He had a complete understanding of the river the bridge had to cross, and a mind unconstrained by what previous engineers had concluded about what was possible. The engineers who said a bridge over the Mississippi was impossible were working from knowledge of what had been built before. Eads was working from knowledge of what the river actually was. Those were two different kinds of knowledge, and in this case the difference was enough to produce the bridge.
The design Eads proposed was unlike anything built before. The standard method for building long-span bridges in the 1860s required temporary wooden falsework erected in the water to support the structure while it was assembled above. The Mississippi made falsework impractical. The strong current would destroy traditional wooden falsework at those spans.
The navigational demands of the steamboats required an unobstructed passage through the main channel for the entire construction period, and the steamboat lobby had the political and legal power to enforce that requirement. Eads designed three arches that would extend out from each pier simultaneously toward the center of each span, with no support in the river at all. This construction method was called cantilevering. Each half-arch extended over the water held by temporary stay cables tied back to the pier behind it.
As the two half-arches from opposing piers approached the center, the final closing pieces locked the arch, and the structure became self-supporting. The method had been used before in smaller applications. It had never been used at the spans Eads was proposing. The center span was 520 feet.
The two side spans were 502 feet each. There was no arch bridge in the world with a main span of 520 feet. Eads was not proposing to extend a known technology by a small increment. He was proposing to double the longest arch span that had ever been successfully built.
The bridge would have to be steel. The structural logic was clear to anyone who followed it without flinching from the conclusion. The spans required a material with higher tensile strength than wrought iron, which was the standard building material of the era. Steel had the required tensile strength.
The calculations were not complicated. The required capacity exceeded what iron could provide, while steel could provide it. The conclusion was that the bridge had to be built of steel. The problem was that no one had ever manufactured structural steel in the quantities and consistent quality that Eads demanded.
The American steel industry in the late 1860s was small, variable, and unproven at scale. Carbon content, which determines strength, varied from heat to heat within the same mill. A structural component specified to a particular strength might perform at that strength or far below it, depending on the batch. Eads met this with testing requirements that the steel industry found unreasonable.
Every steel tube intended for the bridge structure had to be loaded to one and a half times its maximum operating load before installation. Tubes that failed the test would be rejected. Tubes that passed would be marked, recorded, and installed. The tests would be conducted at the construction site under direct supervision.
There would be no exceptions and no waivers. Andrew Carnegie’s iron company was among the firms competing for the steel supply contract. Carnegie and his partner Henry Phipps reviewed the testing specifications and concluded they were excessive. Phipps wrote that full compliance would make the contract unprofitable.
Carnegie responded that the contract should be accepted anyway and the specifications met. The testing was what the engineer demanded, the engineer was building something no one had built before, and meeting the specifications was the condition for getting the work done. Carnegie’s mill complied with the specifications. Carnegie made a profit on the contract.
The steel that went into the arches of the Eads Bridge was tested steel, every piece of it, and the test results are in the construction records. The towers and abutments that would carry the arches were built of masonry and concrete, designed to transfer the thrust of the arch to the foundations. The foundations had to reach bedrock. At the site of the east abutment, bedrock lay 136 feet below the river’s surface.
Pneumatic caissons were the only way to reach that depth. A pneumatic caisson is a sealed working chamber sunk into the riverbed. The principle is simple. Compressed air keeps water out of the chamber, just as an inverted cup retains air when pressed into water.
Workers enter through the airlock, descend through a shaft into the working chamber at the bottom, excavate material from under the cutting edge, and exit when the shift ends. As material is removed, the weight of the structure above forces the caisson deeper. It sinks toward bedrock. At 136 feet below the surface of the Mississippi, the pressure required to keep the river water out of the working chamber was about sixty pounds per square inch above atmospheric pressure.
A worker breathing air under that pressure absorbs nitrogen into the blood and tissues at a rate proportional to pressure and duration of exposure. That absorption is not in itself immediately harmful. The problem occurs when pressure decreases on return to the surface. If the worker ascends too quickly, dissolved nitrogen comes out of solution faster than the body can process it through the lungs.
It forms bubbles. The bubbles form in the joints, in the tissues, in the blood vessels. The pain in the joints is what gave the condition its name. Nitrogen bubbles in blood vessels caused strokes.
Bubbles in the spinal cord caused paralysis. Bubbles in the coronary vessels caused heart attacks. Dr. Alphonse Jaminet was the physician Eads hired to oversee medical operations on the bridge project.
He was a St. Louis doctor with an interest in the effects of compressed air. What the medical literature could tell him in 1870 was limited. The mechanism of decompression sickness was not fully understood.
The existing decompression protocols were based on the work of European divers carried out at lesser depths than the east pier required of Eads. Jaminet established the protocols for the caisson work. On June 30, 1871, he descended into the working chamber of the east pier himself. He wanted to understand the conditions his patients were working in.
He spent twenty-five minutes at working depth. He ascended in about seven minutes, faster than his own protocol specified. By the time he reached his office, the left side of his body was partially paralyzed. He could not walk.
His speech was slurred. He treated himself by recompressing in the caisson and then decompressing slowly under supervision over several hours. The paralysis partially improved over the following weeks. He continued to practice medicine.
He continued to supervise the medical operations at the bridge. The pay of the construction crews was set by the depth at which they worked. Work at shallow depths paid less. Work at great depths paid more.
That difference was recognition of the greater risk of working at greater depth, and it also reflected the fact that workers who had experienced the pressure at depth understood what it could do to them, and some chose not to return. The men who returned were those who needed the money badly enough to accept the risk. The workers in the east pier caisson came from the labor pool available in St. Louis in 1870: Irish immigrants who had come to the city before the war and continued in construction work through the conflict and after; Black workers in the postwar city, free men for whom the construction labor market offered wages that other sectors of the St.
Louis economy did not; river workers who had labored on boats and docks and salvage operations, accustomed to hard conditions near the water. None of them had worked in compressed air at a depth of one hundred feet before. The technology was new, the risks were poorly understood by the workers, and they were not much better understood by the engineers supervising them. The 119 cases of decompression sickness that Jaminet documented in his published report included men who followed the decompression protocol and men who did not, men who showed symptoms within an hour of ascent and men who showed symptoms days later, men who recovered fully and men who did not.
That variability was a reflection of biology. Exposure to the same conditions produced different outcomes in different bodies, and the medicine of 1871 could not predict the outcome any given worker would face. What the medicine of 1871 could do was document what it observed, and Jaminet documented it with a precision that made his report the first comprehensive American clinical record of decompression sickness. The twelve men who died are named in that report.
The causes were consistent with severe cases of decompression sickness: neurological seizures, heart attacks, respiratory failure from bubbles forming in vital vessels. The deaths were not accidents in the traditional sense of construction site incidents. They were the expected result of working at depths for which the medical knowledge and decompression techniques of that era were inadequate, on a schedule set by the requirement that the caissons reach bedrock regardless of how many shifts it took or what those shifts cost the men who worked them. The east pier caisson reached the limestone bedrock in February 1871.
The workers who made the final excavations in the working chamber stood on the floor of the geological column beneath the Mississippi at a depth no American construction worker had ever reached before. A concrete plug was poured to seal the caisson against the bedrock. The caisson was filled. The masonry of the pier rose above it.
Above the caissons, a different set of problems governed the pace of work. The Mississippi did not stop flowing during the construction of the Eads Bridge. Steamboats plied the waters. The current ran through the main channel.
In winter, ice formed along the banks and moved in sheets through the construction site. When temperatures changed, large flat masses pressed against the cofferdams of the piers, against the barges that served as work platforms, against any structure not designed to withstand them. The steamboat lobby insisted through political and legal channels that navigation of the main channel remain unobstructed throughout construction. That constraint was real and binding.
It meant the arch construction by cantilevering had to be done entirely from the piers with no temporary supports in the river, and that every piece of steel going into the growing arch arms had to be lifted and placed without blocking the channel below. The arch tubes were fabricated in Carnegie’s mills in Pittsburgh and shipped by rail to St. Louis. At the construction site, they were moved onto barges, brought alongside the piers, and lifted by derricks mounted on top of the piers.
Each section was a machined steel assembly with a specific curvature designed for its position in the arch shape, and it had to be placed precisely or the growing arm would drift from the calculations. Placing a section a fraction of a degree off specification would double the error in every subsequent section, and by the time the two half-arches reached the center, they would not match. The derrick operators running these lifts were handling loads that swung with the winds of the river. St.
Louis winds moved across the channel at steady speeds, especially in spring and fall, turning a suspended steel section into a pendulum rather than a controlled object. The men on top of the pier receiving the sections and making the connections worked while the section moved toward them and the river waited below. The arch arms extended outward from each pier in this manner, section by section, held by the backstay cables running to the pier anchors. As each arm grew longer, the load on the backstay cables increased.
The cables were monitored. The tension was measured against the values Eads’s calculations predicted. Where measurements matched expectations, work continued. Where they diverged, the cause was investigated before the next section was lifted.
The men who worked on the growing arch arms over the Mississippi worked on structures extending two hundred feet above the river, held by cables rather than ground. The wind that moved against the arms moved the arms. The movement was within calculated tolerances, but it was movement, and the men out on the arms felt it as a physical fact of the job. The river below them was sixty feet deep and running at several miles per hour.
A man who fell from the growing arm toward the center fell a long way before hitting the water, and he hit the water while moving. Construction crews kept safety boats. The river did not guarantee what the response time of the boats could achieve. The Panic of 1873 came in September of that year when the banking house of Jay Cooke and Company collapsed under the weight of overexpansion in railroad finance and took a large part of American commercial credit down with it.
The Eads Bridge was financed by bonds sold in American and European markets, especially in Germany. The panic destroyed confidence in American industrial bonds on both sides of the Atlantic. The bridge company could not sell additional bonds. The proceeds of the existing bonds were insufficient to maintain the construction schedule.
Construction slowed. Workers were paid in scrip. That scrip was a paper instrument of the bridge company redeemable in cash when the company had the liquidity, which it did not have at the moment of issue. A worker receiving scrip for two weeks of labor on the arch arms above the Mississippi was holding a piece of paper that said he was owed money rather than the money itself.
Scrip could be sold to speculators at a discount from its face value. A worker who needed cash and sold his scrip received less than its face value. That difference was the cost of the financial crisis borne by the men who did the work. The speculators who bought the scrip bore no physical risk.
They did not work in the caissons or on the arch arms. They bought a financial instrument at a discount and would redeem it at full value when the bridge company’s finances stabilized. The men who built the bridge in the winter of 1873 and 1874 worked for deferred pay in the middle of a national depression. They went to work in the cold and wind over the river because work was work, scrip was the means of payment, and the alternative was total unemployment.
New financing was secured in the spring of 1874. Construction resumed at full pace. The bridge had to be finished. The closing of the center span arch was the most precise operation in the construction of the Eads Bridge, and it nearly failed because of the sun.
The two half-arches of the center span had grown toward each other through 1873 and into the winter of 1873-1874. When the gap between their advancing tips could be measured against the dimensions of the final connecting pieces, the closing operation could begin. Steel expands when warm and contracts when cold. The thermal change per unit of length is small, but it is not small across a 500-foot arch arm.
A rise of 40 degrees Fahrenheit changes the total length of the steel enough to move the tip of the arm by inches. If the steel is too warm, the arch arms expand and the gap at the center becomes smaller than the space required to insert the connecting pieces. If the steel is at the correct temperature, the gap is correct. The closing had to be done when the steel was cool enough.
The sun foiled the first attempts at closing. The construction crew assembled the connecting pieces at dawn. By the time the work was organized and the pieces were in place at the tips of the arms, the morning sun had warmed the arch tubes enough to shrink the gap past the point of insertion. The pieces would not go in.
The work waited for the next attempt. On the night of September 13, 1873, the construction crew covered the arch tubes with ice. Hundreds of pounds of ice wrapped in canvas and distributed along the full length of both arms, cooling the steel through the night. As the steel cooled, the tubes contracted, and the gap at the center of the span widened.
The work had to be completed before sunrise. The men worked in the dark over the Mississippi. The river below them was black on that September night. The two arch arms stretched into the darkness over the main channel.
At the tip of each arm, where the gap was, the workers placed the connecting pieces and waited for the temperature to drop to the required point. At three in the morning, the gap was right. The connecting pieces were inserted. The bolts were driven home.
The connections were made. When the sun rose, the steel warmed. The arch tubes expanded. The joints compressed together under the thermal load.
The compression held them tight. The arch was closed and stable. The mathematics had been precise. The ice idea had worked.
The men who stood in the September darkness over the river holding the connecting pieces in their hands were there at the right temperature and they did not miss the moment. The Eads Bridge opened on July 4, 1874. The choice of Independence Day was not an accident. A bridge built against the judgment that it was impossible opened to traffic across the river that separated the eastern half of the country from its western interior, and it was staged as a national event, and the date was part of that staging.
President Ulysses Grant attended. The governor of Missouri attended. The mayor of St. Louis attended.
Military bands played. Newspapers across the country covered the event. The speeches described what the bridge meant for St. Louis, for the railroads, for the commerce of the nation, and for the idea of what American engineering could achieve.
To prove that the bridge would bear what it was designed to carry, fourteen locomotives were driven across in succession, seven on each track of the double-deck structure. They moved slowly. Their total weight settled onto the steel arches that most experienced engineers had predicted could not be built. The arches held.
The deflection under load was within the range the calculations predicted. The bridge performed exactly as Eads said it would. The crowd on the Illinois shore watched the locomotives cross. The crowd on the Missouri shore watched them arrive.
The ferry operators, who had run the crossing for decades, watched from the water. The men who built the bridge were not in St. Louis that morning as a group. The ironworkers who assembled the arch tubes in the cold months over the river were working at other jobs in other cities.
The compressed-air workers from the east pier caisson, those still working, had moved on to other projects. The laborers who moved material and operated equipment had scattered across the country. That is how construction work goes. Workers follow the work wherever it is.
When the work is done, they leave. The opening ceremony is for the people whose names appear on the commemorative plaques. James Eads’s name was put on the bridge. It is called the Eads Bridge.
His name is in the history of engineering, in the records of the American Society of Civil Engineers, and in every account of how steel bridge construction began in the United States. The twelve workers who died of decompression sickness are named in Jaminet’s report. The other 107 who were stricken are named in that same report. The workers who fell from the arch arms into the Mississippi are in the accident records the bridge company was required to keep.
Jaminet’s report is one of the most important documents in the early history of American occupational medicine. It was the first comprehensive clinical description of decompression sickness produced in the United States. It fed directly into the scientific understanding that eventually produced the Navy decompression tables, which protected compressed-air workers for the rest of the industrial age. The men in that report faced death or injury in service of a foundation that had to reach a certain depth beneath the Mississippi.
The foundation reached that depth. The pier has stood on it for 150 years. Whether the wages paid to those men were adequate for what the work took out of them is a question the payroll records do not answer, because the men who set the wages kept those records. Eads continued after the bridge.
The mouth of the Mississippi at New Orleans was silting up. The South Pass channel through the river delta had become too shallow for oceangoing vessels. The Army Corps of Engineers proposed continuous dredging. Eads proposed jetties, parallel structures extending into the Gulf of Mexico that would narrow the South Pass channel and increase the velocity of the current in it, so that the force of the river itself would scour out the sediment.
He was told the jetties would not work. He was told he had no experience in marine construction, and that the Corps of Engineers had studied the problem and reached a different conclusion. The steamboat interests opposed him as they always had. And the engineers who had been wrong about the bridge were not inclined to believe he was right about the river mouth.
He built the jetties under a conditional contract. The government would pay him only if the South Pass channel reached the specified depth within a specified period of time. He borrowed the money to finance the construction. The channel reached the specified depth.
The government paid him what he was owed. The South Pass jetties opened the mouth of the Mississippi to ocean commerce in a way that dredging alone could not have maintained. Eads died in 1887 in Nassau in the Bahamas, where he had gone seeking treatment for health problems that had worsened over the previous decade. He was sixty-six years old.
He had spent a large part of his career in physically demanding conditions that the medicine of that era did not understand, including the time he spent in the caissons beneath the Mississippi, which he entered himself to understand what his workers faced. Whether exposure to compressed air contributed to the decline of his health in his final years is a question the medicine of the 1880s did not ask, and the records do not answer. If you cross the Eads Bridge today, you are crossing a structure that is 150 years old. It carries light rail, pedestrians, and cyclists.
The automobile lanes were closed and removed decades ago when St. Louis traffic patterns changed, and the crossing designed for railroad trains and horse-drawn vehicles was adapted to meet the needs of the city in a different century. The double-deck bridge still serves the traffic required of it. If you stop in the middle of the bridge and look at the river, you are looking at the Mississippi flowing through the main channel at the same speed it ran when the compressed-air workers were shoveling gravel in the dark 136 feet below you.
The east pier is beneath you. Its foundations rest in the bedrock inside the caisson that the workers sank through 1870 and 1871. The caisson is still there. The concrete plug sealing it against the limestone is still there.
The weight of the pier, the arch, the deck, every vehicle, every train that has crossed this bridge since July 1874 presses on that foundation, and that foundation has not moved. If you look at the steel arch above you, you are looking at the material produced in Carnegie’s mills to Eads’s specifications, tested piece by piece before installation, assembled by the hands of men working on cantilevered arms over the main channel in the cold months of the early 1870s. The steel has been maintained. Components have been replaced when inspection revealed corrosion, but the arch remains the arch that the construction crews closed at three in the morning using ice in the September darkness over the river when the gap was exactly right.
The mathematics was correct. The men who carried out those calculations in steel and in the earth beneath the river exist in the payroll records, in Jaminet’s medical report, and in the accident records, and in no other document that was preserved or widely distributed. They came to St. Louis from wherever the construction labor market brought them.
They entered the caissons because the caissons were the workplace, and the work paid more than the alternatives. They built the arch arms out over the river because the steel was what was being assembled, and assembly was the job. When the bridge opened on July 4, 1874, they were gone. The bridge they built is still standing.
The river runs beneath it as it has always run, cold and fast, carrying toward the gulf the water and sediment of half a continent. The piers hold against the current the same way they have held since 1874. The foundations in the bedrock do not record the names of the men who sank the caisson to the depth the engineer required. They only bear the weight placed upon them, which they have done without interruption for 150 years, because the men who went down into the dark beneath the river followed the specifications to the correct depth, and the correct depth was the depth James Eads calculated, and the calculations were precise.
The Mississippi does not remember who built the bridge. The bridge does not record it. The caisson at the bottom of the river does not care who went down there in the compressed air to place it.
It holds.