In 1875, a Chinese laborer stood at the mouth of a tunnel in the Tehachapi Mountains, driving a four-foot steel drill into solid granite by hand. His name appears in no surviving document. He was…

The summer of 1875, at the mouth of a mountain tunnel in Kern County, California, a man stood drilling into granite by hand. His drill was a four-foot length of octagonal steel, sharp at the point. His name appears in no document that any researcher has made available. The records show that he was Chinese, that he was one of roughly three thousand Chinese laborers employed on the Southern Pacific line through the Tehachapi Mountains, and that the temperature outside that tunnel portal in July, on the Mojave Desert side of the range, ran above one hundred degrees Fahrenheit.

Thumbnail

Inside the tunnel it was twenty degrees cooler, which made it the more survivable place to work. He was drilling a hole for black powder. The hole had to be eighteen inches deep and straight. Straight, because the charge had to break the rock in the direction the tunnel was going.

The tunnel was going in the direction the engineers had determined. The engineers had determined a direction that would carry the Southern Pacific Railroad across the Tehachapi Mountains at a grade a steam locomotive could climb. A 2. 2 percent grade means the track rises 2.

2 feet for every 100 feet of horizontal distance. That does not sound like much. It was the steepest grade Southern Pacific determined its locomotives could handle with a useful payload. Above 2.

2 percent, the locomotive could climb, but only by cutting its train down to a length that made the crossing economically pointless. A railroad that could move only three cars at a time over a mountain pass was not a railroad. It was an expensive way to prove that the mountain had won. The Tehachapi Mountains were trying to win.

This is the story of how Southern Pacific put a railroad across them in 1876, and specifically, how one engineer solved a grade problem no one had solved before by doing something no American railroad had ever done. A full loop, a circle of track with a circumference of 3,799 feet, that allows a train to pass over its own rear cars as it gains 77 feet of elevation in a horizontal distance that would otherwise have required an unworkably steep grade. The Tehachapi Loop. It is still there.

About forty trains pass over it every day. The long freight trains that cross it today are long enough that the locomotive pulls directly over the rear cars of the same train as it rounds the loop, which looks impossible and is simply true. The men who built it are not on any commemorative plaque at the Loop. They exist in the Southern Pacific Railroad payroll records of 1875 and 1876, and in the accident records, and in no other document that anyone has made broadly available to the public.

Their names were not recorded with the care that was given to the engineering specifications. That was not an oversight. That was the system. To understand what Southern Pacific was trying to do in the Tehachapi Mountains in 1875, you have to understand what California was that year and what it was not.

California in 1875 was two economies, separated by mountains. The northern economy was centered on San Francisco, the Bay, the port, the financial houses, the manufacturing, the wealth accumulated from the gold rush, the transcontinental railroad, and the trade contracts that followed. The southern economy was Los Angeles, which in 1875 was not yet the city it would become. It was a town of perhaps nine thousand people, geographically isolated from the rest of the state and the rest of the country, unreachable by railroad from any direction, dependent on long and expensive shipping routes, and vulnerable to every delay and hazard the Pacific coast could produce.

Between San Francisco and Los Angeles stood the Tehachapi Mountains. They still stand there today. They are the transverse range, the geological anomaly of California, a mountain chain running east and west instead of north and south, cutting across the state and separating the San Joaquin Valley from the Mojave Desert. Tehachapi Pass sits at 3,964 feet.

The floor of the San Joaquin Valley near Bakersfield sits at about 400 feet. That is a rise of 3,564 feet over the distance Southern Pacific needed to travel. Southern Pacific had been founded by the same men who built the Central Pacific, the western half of the transcontinental railroad completed at Promontory Summit, Utah, in May 1869. Leland Stanford, Collis Huntington, Charles Crocker, and Mark Hopkins, the Big Four of California railroad finance, took the wealth generated by the transcontinental line and used it to extend their tracks in every direction the California economy required.

North toward Oregon, east toward Nevada and Arizona, and south toward Los Angeles, across whatever mountain ranges stood between the San Joaquin Valley and the population centers below the Tehachapis. The case for the southern route was not complicated. Los Angeles needed a railroad or it would remain a second-rate town indefinitely. Southern Pacific needed Los Angeles, or a competitor would beat them to it.

The competitor was the Texas and Pacific Railway, backed by Thomas Scott, building westward from Texas with the intention of reaching the Pacific coast before Southern Pacific arrived from the north. The race was real. The stake was commercial control of Southern California for a generation. The question was not whether to build across the Tehachapi Mountains.

The question was whether a railroad across the Tehachapis was practically possible at a grade that allowed profitable operation. A field survey would answer that question. Southern Pacific commissioned the survey in 1874 and sent a civil engineer named William Hood to determine the route. Hood studied the Tehachapi range for months.

He walked the drainage passes and ridgelines. He measured grades with his instruments and with his body, climbing slopes his assistants could barely follow. He identified the passes, valleys, and rock formations that would determine the route of the track and the cost of building it. The main problem was the approach from the south.

Starting from Mojave on the desert floor, the track had to climb toward Tehachapi Pass. The distance was workable. The elevation gain was acceptable in total, but there was a section in the valley below the pass where the drainage patterns and rock formations forced the route through a corridor that required gaining elevation over the available horizontal distance at a rate that exceeded 2. 2 percent.

Significantly exceeded it. A conventional survey would have avoided the area and looked for another route. Hood looked at the problem and found a different answer. If the track had to gain more elevation than the available horizontal distance allowed at 2.

2 percent, it needed more horizontal distance. The way to create more horizontal distance inside a narrow valley is to make the track longer without lengthening the valley itself. The way to make the track longer without stretching the valley is to make the track curve back on itself. Not a switchback.

A switchback requires a train to stop, reverse direction, and proceed again, a slow and complex operation that imposes harsh demands on the locomotive and crew and is limited in the freight that can be hauled efficiently over a continuous grade. A loop. A full circle. The track climbs through the valley, bends in a complete 360-degree arc, and continues in its original direction 77 feet higher than it was before the arc began.

The train traveled in a circle and came out higher. If the train was long enough, the locomotive, after completing the circle, would pass directly over the rear cars of its own train, which were still in the lower part of the loop. Hood worked out the engineering in 1874. The circumference of the loop, 3,799 feet.

The tunnel at the bottom of the arc where the track passes under itself, 93 feet long. The grade through the loop, a continuous 2. 2 percent around the full circumference. The total elevation gained in one circuit, 77 feet.

The mathematics worked. He submitted the survey to Southern Pacific. Southern Pacific approved the route. Construction was authorized in 1874 and began in earnest in 1875.

The mountain would get its railroad whether it wanted it or not. The men who came to build the Southern Pacific line across the Tehachapi Mountains in 1875 came essentially from one community. They were Chinese. Specifically, they were part of the great numbers of Chinese laborers who had come to California in the decades after the gold rush.

Men who had crossed the ocean from Guangdong Province and other coastal regions of southern China, who had worked in the placer mines and the levee construction of the Sacramento-San Joaquin Delta, in the washing and canning industries on the coast, and who had built the Central Pacific Railroad across the Sierra Nevada between 1865 and 1869. The Central Pacific had employed about ten thousand Chinese workers at the peak of its Sierra construction. They dug and blasted granite that broke drill steel and killed men who misjudged a fuse. They worked through Sierra winters that buried their camps under forty feet of snow and killed men who did not reach shelter in time.

They were lowered in wicker baskets over rock faces to drill blast holes in vertical cliffs where there was no ledge to stand on. They built the most technically demanding section of the first American transcontinental railroad, and when the line was completed, they received the wages Central Pacific had set for Chinese labor, lower than the wages paid to white workers for comparable work, and then they were discharged without ceremony at the completion of the transcontinental line. Charles Crocker had been the construction superintendent of the Central Pacific. He knew what the Chinese workers had accomplished in the Sierra.

When the Tehachapi construction demanded a workforce capable of digging and blasting through mountain terrain at the pace Southern Pacific’s schedule required, Crocker and Southern Pacific called on the same crowds. About three thousand Chinese laborers were employed in the Tehachapi construction. They were organized into gangs of twenty to thirty men, each gang headed by a Chinese foreman who took direction from a white supervisor above him. The labor contract ran through the foreman.

The worker dealt with the foreman. The railroad dealt with the contractor. The Chinese worker at the bottom of this arrangement had no direct standing with the railroad that employed his labor. The wages paid to Chinese workers on the Tehachapi construction ran to approximately twenty-six to thirty dollars per month.

White workers doing comparable labor on the same project received thirty-five dollars a month. The difference was not hidden. It was the established rate. The Southern Pacific payroll records showed two wage scales because two wage scales were the standard in California railroad construction in 1875.

Central Pacific had set the standard. Central Pacific had set that standard because no one with the power to change it had any incentive to do so. The Chinese workers supplied their own food and cooked for themselves. This was not a benefit provided by the railroad.

It was an added cost borne by the workers, which meant the real wage gap between Chinese and white workers was larger than the stated five-to-nine-dollar monthly difference. The railroad supplied the tools and the powder. It did not supply food, blankets, or shelter in any comprehensive form. The workers camped along the line in tents and structures they built from scrap lumber and used canvas.

In July, on the desert approach to Tehachapi Pass, the temperature inside a canvas tent at noon was the same as outside. There was no shade on the lower slope of the route. The sun reflected off the pale desert rock, off the sand, and off the steel the crews had already laid, and the heat accumulated in the valley in the midday stillness, where there was no wind because the valley walls blocked it. The men who dug and blasted rock in that valley at noon on a July day in 1875 worked under conditions that modern occupational health standards prohibit.

They were not working under modern occupational health standards. They were working under the conditions established by Southern Pacific and its contractor, conditions demanded by the construction schedule, reflected in the wage rates, and understood by the men from Guangdong who had come to build railroads in California to be the nature of the work. Building the line from Bakersfield south across the Tehachapi Mountains required the excavation of eighteen tunnels. Eighteen tunnels through rock ranging from soft sandstone on the lower desert approaches to hard granite in the upper valley sections.

The total length of the tunnels was 6,966 feet. Each tunnel had to be dug and blasted from both ends simultaneously. The two faces advanced toward each other through the rock until they met, and they had to meet with enough precision to hold the grade and alignment, so that the two sections of track inside the finished tunnel connected without any kink, bulge, or deviation from the grade Hood had set, the grade the locomotives had to climb. The drilling was simple, slow, and physical.

A gang of men worked at the tunnel face. One man held the drill, a steel bar octagonal in cross-section, sharp at the end, turning it slightly between each blow. The other men swung hammers onto the head of the drill. The turn between hammer blows changed the strike angle gradually, keeping the drill from jamming in the hole and grinding the rock at the bottom into powder that could be cleared before the next blow.

A four-man crew working a single drill could advance about twelve inches per hour in hard granite. An eighteen-inch hole was charged with black powder. The crew tamped the charge, cut the fuse to the length the foreman specified, and cleared the tunnel face. The charge detonated.

The blast shattered the rock at the face, filling the tunnel with smoke and dust. When the air cleared enough to return, the crew went back in and began removing the broken rock, the muck, by hand into carts to the tunnel portal. Then the cycle began again. Drill, blast, muck.

Drill, blast, muck. In a Tehachapi tunnel in 1875, a face could advance three to four feet in a single workday in favorable rock. In granite, the advance was less. In broken rock requiring timbering behind the advancing face to prevent collapse, the advance was much less.

Eighteen tunnels totaling 6,966 feet, advancing from both ends simultaneously. The schedule arithmetic was straightforward and remorseless. The schedule did not care about granite. The blasting was not always clean.

A charge that failed to detonate fully left live powder in the broken rock at the face. A worker clearing muck after a failed blast who struck a live pocket with his pick could set off the remaining charge without warning. The Tehachapi construction records do not count the number of men killed or injured that way. The records that exist show project totals.

The specific names and circumstances are not in any document that has been comprehensively made available. What is known is that Chinese workers on the Central Pacific died from premature explosions, tunnel collapses, avalanches, and the cumulative physical toll of working on compressed schedules under harsh conditions and at wage rates the construction reports acknowledged, and that the company’s wage structure did not reflect that as a risk premium. The same powder, the same technique, and the same men worked the Tehachapi tunnels in 1875. The loop tunnel was 93 feet long.

By the standards of the eighteen tunnels on the line, it was short. The drills who cut it would finish it within weeks. What made the loop tunnel important was not its length but its function. Without that 93-foot excavation, the loop could not be completed.

The track entering the tunnel from the upper arc and emerging from the lower arc had to align within the tolerances required by the track geometry. The men who dug the loop tunnel were setting the keystone of an engineering solution their engineer had calculated on paper in 1874, a solution confirmed or denied when the drill faces met. When the faces met, they matched. The mathematics had been precise.

Summer work in the canyon meant heat, dust, powder smoke, and the sound of hammers on steel. Winter work in the high elevations meant cold, damp, mud, and the same hammers on the same steel in temperatures that froze hands inside gloves and made tool handles slick with frost. Tehachapi Pass sits at 3,964 feet. At that elevation in January, the temperature drops below freezing at night and does not always rise during the day.

Rain in the Tehachapis comes as rain at the lower elevations and as snow on the summits. The workers who had come from the Sierra Nevada construction site in the late 1860s knew what a California mountain winter demanded. But a Sierra winter differs from a Tehachapi winter. Sierra winters produce snow measured in feet in every storm and temperatures far below zero.

Tehachapi winters are more moderate. The men who survived the Sierra construction were not afraid of a Tehachapi winter. They were experienced. But experience did not make the winter warm.

It made the winter survivable. Construction progressed through the summer of 1875, through the winter, and across the spring of 1876. The tunnels advanced on their courses. The ridges were cut with picks, shovels, and explosives.

Material was moved by cart and wheelbarrow to the fill areas where the track had to cross drainages. The fills were built from the material produced by the cuts. The track followed the cuts and fills at the grade Hood had set, at no other grade, because the grade was the constraint to which everything else served. The loop section was graded last, or near last, because its geometry depended on establishing the alignment of the approaches first.

The engineering of the loop required the workers to construct a circle, a full 3,799-foot arc, at a continuous 2. 2 percent grade, meaning the elevation of the track bed was changing constantly around the entire circumference, and the grading crew had to maintain that continuous change against an actual terrain that offered no convenient circular edge at the right height. The terrain had to be cut and filled to match that geometry. In the canyon below the pass, the terrain was steep and irregular, and the excavations required to establish the loop grade were deep in places.

The grading was done by hand. The Chinese workers, using picks, shovels, and wheelbarrows, moved whatever material the engineers determined had to be moved. Grade stakes were set by the surveyor. The workers excavated down to those stakes.

They moved the earth to where the fill stakes required it to be laid. The engineering of what they were building was not visible to any of them on any given day, because the circle was too large to be seen as a circle from inside the canyon. They were grading a section of railroad that looked like every other section, and they did not know that the track was curving back on itself, and that a train crossing it a century and a half later would still be crossing the track they laid in 1876. That was not something they were told.

A grade stake and a wheelbarrow defined the full scope of the work in front of them. Rail laying began as each graded section was completed. The rail gangs worked behind the graders at the pace every major railroad project had established. Ties were unloaded from a flat car running on the new track, the iron men lifted the rails and set them, and hammers drove the spikes, three blows to a spike.

The car moved forward, and the process repeated without pause through the workday. At the circular curve, the rail gang followed the arc of the circle rather than the straight alignment typical of valley construction. The ties were curved, and the rails had to be bent to fit the radius of the curve. A 3,799-foot circumference describes a circle with a radius of about 604 feet, a moderate curve by railroad standards, within the limits Southern Pacific trains could negotiate without derailing.

The bending was done by the gangs as they laid the rail, using the weight of the bar itself and a lever. When the curve was complete, the surveyor walked it with his instruments. He checked the grade at intervals around the full circumference. He checked the horizontal alignment.

He checked the clearance at the point where the upper arc of the curve crossed over the lower arc, with enough vertical distance to ensure a train on the upper track would clear the equipment on the lower track. The clearance was sufficient. The grade was within specification. The alignment was correct.

The curve was workable. On September 5, 1876, Southern Pacific completed the line through Tehachapi Pass and connected the San Joaquin Valley to Los Angeles by rail for the first time. A locomotive crossed the circular loop. The engineering William Hood had calculated in 1874, which three thousand workers had converted into earth, rock, and iron through two years of digging, blasting, and grading, held.

The opening of the Tehachapi line was a landmark event in the institutional history of Southern Pacific, in the economic history of California, and in the history of the city of Los Angeles. The link between Northern and Southern California, made impossible by the mountains, was made possible. The population of Los Angeles County in 1880 was 33,381. By 1900 it was 170,298.

The railroad was not the only cause of that growth. But it was a necessary one. The engineers who designed the line received recognition in the technical literature of the period. Hood’s Loop appeared in engineering publications as a model of applied engineering problem-solving against grade constraints.

Hood went on to a long career with Southern Pacific, rising to the position of chief engineer. His name appears in the engineering literature of the Tehachapi crossing. His loop bears his name in those references, though the structure is called the Tehachapi Loop in most public contexts, and the mountain took the name. The names of the Big Four, the financiers of the construction, were recorded in the newspapers and in the political history of California, and in the libraries and museums their accumulated wealth eventually funded.

Stanford University, the Huntington Library, and the institutions that bear those names were built on the surpluses generated by the transcontinental line and its extensions. The Tehachapi line was one of those extensions. The Chinese workers who graded the loop, dug the tunnels, and laid the rails are not present in the engineering literature of the Tehachapi crossing. They are not present in the public interpretation of the loop in any form a visitor to the overlook would encounter today.

There is a county park above the loop. There are interpretive signs. The signs explain the engineering of the loop and credit the engineer who designed it. They do not mention the workforce that built it.

They do not mention the wage differential under which that workforce labored, nor the camp conditions along the canyon, nor the names of the men who died at the tunnel faces when a blast charge failed. This was not unique to the Tehachapi construction. This was the condition of Chinese labor in California in the 1870s, and the condition was about to get worse. The Chinese Exclusion Act was signed into law by President Chester Arthur on May 6, 1882.

The act prohibited the immigration of Chinese laborers to the United States. It barred Chinese residents from naturalization. It was the first federal law to restrict immigration on the basis of nationality and race. The men who built the transcontinental railroads, the Tehachapi crossing, and dozens of other projects the California economy required were excluded by the state those projects had built.

The law came six years after the opening of the Tehachapi line. The men who had laid the loop were still alive in 1882. Some of them were still in California. They had built the infrastructure of a state that had just legislated their exclusion from it.

What happened to them afterward is a question the records do not answer clearly, because the records were not kept with their future in mind. The payroll records end when the project ends. The payroll records do not follow a man from the last day of Tehachapi construction to wherever he went next. He leaves the records on the same day the work ends, just as the iron workers of Mackinac left, and the divers of the San Francisco harbor projects left.

Workers left every construction site from the Civil War onward. Not with ceremony, not with paperwork, but simply because the work was done, and completed work requires no documents. The Tehachapi Loop still sits in place. It has been in continuous operation since September 5, 1876.

It is now operated jointly by the BNSF Railway and Union Pacific, which share trackage rights over the former Southern Pacific main line through the mountains. About forty to fifty trains pass over the loop every day. The freight trains that use the line today are longer than any train that crossed the loop in 1876. Unit grain trains and double-stack container trains run up to a mile and a half long, longer than the 3,799-foot circumference of the loop itself.

When a train of that length crosses the loop, the locomotive passes directly over its own rear cars in the lower arc. That is a visual fact produced by the geometry of the loop, not visible in 1876 because no train operating then was long enough to produce it. The engineering of the loop has not changed. The grade is still 2.

2 percent. The circumference is still 3,799 feet. The tunnel is still 93 feet. The clearance between the upper and lower arcs is still what the survey defined in 1874.

The track has been continuously maintained over 148 years of operation. The wooden ties have been replaced many times. The rails have been replaced and upgraded to heavier sections as locomotive and load weights increased through the diesel era and to the present. The roadbed has been reballasted.

What has not changed is the geometric alignment. The circle the Chinese workers laid in 1876 is the circle BNSF maintains today. The grade stakes are gone. The alignment they established remains.

If you go to the Tehachapi Loop overlook on a clear November morning, when the desert air is cold and the mountains are sharp against the low sun, you can stand above the canyon and watch a long freight train coming from the south. The locomotive enters the lower arc of the loop. It disappears into the tunnel. It reappears above, on the upper arc, still pulling.

If the train is long enough, there comes a moment when the locomotive, having completed the circle, passes directly over the last cars of its own train, which are still below, in the lower arc, still being pulled forward. The train crosses itself. The geometry does what Hood calculated in 1874. Below, where the canyon narrows at the bottom of the arc, the tunnel portal is still there, with its stone face and its solidity.

That arch is the one the drill crews cut from both ends through the summer of 1875. The alignment held when the tunnels met. And it has held for every train that has passed through it since. The men who cut that tunnel came from Guangdong Province.

They crossed the Pacific, worked in the Sierra Nevada, and came to Tehachapi because railroad work was there. Railroad work in California in 1875 depended on Chinese labor. Chinese labor in California in 1875 was men who understood that the wage the contractor offered was the wage, and the conditions the mountain imposed were the conditions, and that the work would be completed, and then there would be other work somewhere else until the law said otherwise, and then what the law dictated would happen. What happened after the law was not recorded with the precision that the engineering of the loop was recorded.

The loop is still there. The train still rounds it. The grade is 2. 2 percent, exactly as the survey established in 1874, in a canyon where three thousand men spent two years turning it into a railroad.

Their names are not on the signs at the overlook. Their work is what is on the signs. There is a difference.

Related Posts

In 1900, guests at the Holloway Hotel in Newton County, Arkansas, kept vanishing from the same three rooms on the eastern wing. Seamstress Mary Carver left her sewing kit behind. Bible salesman…

The scratching started again around midnight, constant now, and Mary Ellis knew she would not sleep. She lay in her narrow room at the end of the third-floor corridor and listened to the sound working its way up through the building’s bones, a rhythmic scrape, scrape, scrape that came from somewhere below the floorboards. Mr. … Read more

In the 1980s, a high school rumor could travel through an entire building by lunchtime without a single text, group chat, or post. Someone whispered “after school, by the bleachers,” and the whole…

The whole school was already there by the time the circle closed. No one had sent a single message, no group chat existed, no one had posted anything anywhere, yet by lunchtime everyone knew the fight would happen after last bell, next to the bleachers. That was how news traveled then: whispered from locker to … Read more

In 1950, Roy Cox spent eight months building a tiny engine from scratch, holding tolerances of 25 millionths of an inch—any piston that deviated went straight in the trash. The Cox 049, a working…

The sound carried three backyards on a Saturday morning without even trying. Thin and slightly wrong, like something spinning faster than it had any right to. If you grew up anywhere in America between 1955 and 1985, you knew exactly what it was. It was the Cox 049, a working internal combustion engine machined to … Read more

In November 1909, authorities in Shannon County, Missouri, entered the Warren homestead and found the beds made, the pantry stocked, and a half-written letter on Thomas Warren’s desk. Thomas and…

Idaho Press-Tribune, October 17, 1907—that was the date stamped on the clipping, but the story itself was older, and stranger, and it began long before the newspaper ever touched it. It began, as so many things do, in the dark of a Missouri autumn. In the autumn of 1909, when the leaves turned copper and … Read more

In March 1923, Clarence Saunders cornered Wall Street itself. Working through a broker and southern banks, the Memphis grocer quietly bought nearly ev…

In the summer of 1923, on a hill at the eastern edge of Memphis, a half-finished mansion of pink Georgia marble rose against the sky. The man who ordered every stone placed there walked to the gate, handed the keys to his creditors, and never lived in the house. His name was Clarence Saunders, and … Read more

In 1848, Samuel Knap’s men dug 18 feet into a filled-in pit near Michigan’s Ontonagon River and struck a single mass of nearly pure copper—six tons of it. But the copper wasn’t lying on the floor….

The copper tool came out of a mining pit in Michigan and went to a laboratory. The lab returned a date of 8,500 years old. Hold that number, because it breaks something. That tool was already ancient when the first pyramid in Egypt was still only an idea in someone’s head. It was already old … Read more

Leave a Reply

Your email address will not be published. Required fields are marked *