In 1922, crews labored 80 feet under the Delaware River in a pressurized steel chamber, drawing air at about 30 pounds per square inch to keep the water back as they dug down toward bedrock….

In the spring of 1922, a man was at work inside a caisson resting on the bottom of the Delaware River in Philadelphia, Pennsylvania, in compressed air held at roughly thirty pounds per square inch. That was higher than ordinary atmospheric pressure, inside a steel chamber sunk eighty feet beneath the surface, cutting through river silt in water the color of mud, at the base of a river that had drained the Delaware Valley for ten thousand years. He wanted no interruptions. The pressure was not optional; take it away and the river would have pushed through the porous sediment, poured into the chamber, and drowned every man in it.

Thumbnail

With the pressure maintained, the crews could excavate the riverbed by hand, hauling out material so that concrete could be poured in its place to serve as the footing for a tower. Caisson work means laboring under conditions the human body was never built to withstand. Nitrogen from the compressed air dissolves into the blood at a rate that rises with the pressure. Any man who climbed out of the pressurized chamber too fast once his shift ended, going back to ordinary atmospheric pressure before his blood could shed the dissolved nitrogen, courted the danger of bubbles forming in his joints and his bloodstream.

In 1922 the ailment went by the name caisson disease. These days it is known as decompression sickness. In 1922 it was handled with lock chambers meant to govern how quickly the pressure changed, and with medical chambers meant to treat the men for whom the locks had failed. The workers in the Delaware River caissons during the bridge’s construction grasped the hazards the way men on any dangerous job do: they knew the risks were real, and they knew they would go down and do the work regardless, because that was what they had signed on for.

The bridge they were raising did not yet have a name. When it opened it would be known as the Delaware River Bridge, and in 1956, three decades after that opening, it would be renamed the Benjamin Franklin Bridge, once Philadelphia decided a structure of such scale ought to carry the name of a man of equal stature. In 1922 it was the Delaware River Bridge, which said exactly what it was. The men working the caissons at the riverbed called it whatever working men call a job they are in the middle of, which is rarely its official name.

To grasp why Philadelphia had devoted most of the preceding twenty years to trying to span the Delaware River, and why this attempt absorbed the engineering attention of two states, a federal government, a bond market, and a workforce numbering several thousand, you have to grasp what the Delaware River was, and what getting across it by any means short of a bridge cost the people on either side. At Philadelphia, the Delaware runs about two thousand feet wide at the crossing the engineers finally settled on. It carries commercial shipping from the port of Philadelphia downstream to Delaware Bay and the open Atlantic. The minimum navigational clearance required for that shipping—the oceangoing freighters, tankers, and passenger vessels the port of Philadelphia handled in the first decades of the twentieth century—was 135 feet of vertical clearance above the high-water mark.

A bridge that failed to give 135 feet of vertical clearance at the navigation channel was not a bridge that shipping could pass beneath on the river. A bridge that did give 135 feet of vertical clearance at the channel had to start climbing to that height long before it reached the channel’s edge. That meant any bridge of conventional design would need approach ramps of tremendous length on both shores, cutting into the urban fabric of a city already built right up to the water’s edge on the Pennsylvania side and heavily developed on the New Jersey side at Camden. The ferry service linking Philadelphia and Camden had been running for more than a century before the bridge went up.

The ferries made the crossing in about fifteen minutes. They ran on a timetable. They carried vehicles and pedestrians. They were inadequate for the traffic volumes that the automobile economy of the 1920s was generating.

By 1920, the count of vehicles crossing the Delaware River between Philadelphia and Camden by ferry had grown large enough that operators were turning vehicles away at peak hours, and the line of waiting cars on the Philadelphia side backed up into the city’s street grid. A city the size of Philadelphia and a port the size of the port of Philadelphia could not run efficiently when a two-thousand-foot river was crossed by boats on a fixed schedule with fixed vehicle capacity, and a queue that lengthened every year as car ownership climbed. The bridge was not a luxury. It was what the commerce of two states demanded.

The first serious proposals for a bridge over the Delaware at Philadelphia surfaced in the early years of the twentieth century. Those proposals ran straight into the legal fact that the Delaware River forms a boundary between two states. Pennsylvania owns the crossing from its shore to the middle of the river. New Jersey owns the crossing from the middle of the river to its shore.

Putting a bridge across the river demanded that both states agree on the same structure, the same financing, the same operating authority, and the same split of construction costs. The Delaware River Joint Commission was formed by an interstate compact in 1919 to do what neither state could manage alone: serve as a single authority able to design, finance, build, and operate a crossing that neither state fully controlled. The commission brought in Ralph Modjeski, a civil engineer of Polish birth who had been practicing bridge engineering in the United States since the 1890s and had designed and built bridges over the Missouri, the Mississippi, the Ohio, and the St. Lawrence Rivers.

Modjeski knew long-span bridge design by building them, not from theory alone. He approached the problem of crossing the Delaware River just as he had approached every crossing he had taken on before: the river sets the problem, and the engineer’s job is to work out the solution the river demands. What the Delaware demanded was a suspension bridge. Navigational needs ruled out any bridge type that put piers in the navigation channel.

The breadth of the crossing ruled out any conventional design able to span two thousand feet without intermediate support. A suspension bridge with a tower on each bank and a main span that cleared the navigation channel without intermediate support was the only structural answer that satisfied every constraint at once. The main span of the bridge Modjeski designed measured 1,750 feet between tower centers. At the moment it was finished in 1926, it was the longest suspension bridge span in the world.

It exceeded the prior record by more than 150 feet. The mark it surpassed was held by Detroit’s Ambassador Bridge, a project being built at the same time, and whichever finished first would settle the matter—though no one framed it publicly as a contest, since both were public works rather than private commercial enterprises. The Delaware River Bridge opened first. Philadelphia took the record.

The towers holding the main suspension cables stand 380 feet above the river’s high-water mark. They rest on foundations that the caisson crews of 1922 sank into the Delaware riverbed, driving through eighty feet of sediment and decomposed organic material until they reached the bedrock that engineering borings had indicated lay below. The Pennsylvania tower foundations sit on bedrock 94 feet beneath the river’s surface. The New Jersey tower foundations sit on bedrock 74 feet beneath the river’s surface.

That depth difference mirrors the character of the riverbed geology, which does not hold uniform across the two-thousand-foot width of the crossing. The sediment column runs deeper on the Pennsylvania side. Bedrock shows up somewhat sooner on the New Jersey side. As a result, the diver on the Pennsylvania side had to descend farther and remain under greater pressure for a longer stretch.

The caisson is a working chamber lowered through the sediment by its own weight. Its walls function as a cutting edge that bites into the material while excavation within removes the support beneath it. An air lock at the top of the caisson holds the pressure difference that keeps the water out. Compressed air is pumped in.

Excavated material is hauled out through locks built for that purpose. Concrete is pumped down to fill the void behind the cutting edge. As the chamber sinks, the men inside labor in compressed air—breaking up sediment with picks, shovels, and pneumatic tools, loading the broken material into containers that the lock lifts to the surface, and going down with the chamber as the work strips material from beneath them. The caisson crews on the Delaware River Bridge came out of the marine construction workforce along the northeastern seaboard.

Men seasoned in compressed-air work from tunnels and foundations on industrial waterfronts. They were not a uniform workforce. On major public infrastructure projects in the northeastern United States in the early 1920s, caisson work fell to a labor force that included recent immigrants from southern and eastern Europe—Italians, Poles, Slovaks, Greeks—who had arrived in the decade before the war and entered the construction labor market at its lowest rungs, along with Black men from the American South who had come north in the Great Migration (hastened by wartime labor shortages) and found in construction one of the few sectors of northern urban economies that hired them, at wages below those of the white workers beside them. The industry’s hierarchy handed them the jobs nearest the hardest and most dangerous work.

Exposure to compressed air in the caisson environment does not differ by race. Caisson disease does not pick its victims by national origin. Nitrogen dissolves into every man’s blood at the same rate, and bubbles form in every man’s joints by the same physiology. The men who rose too quickly from the caisson on the Pennsylvania side of the Delaware River did so because the decompression protocols of 1922 rested on an incomplete grasp of the physiology involved, and the economic pressure to push men through the locks faster than strict safety procedures would permit was present on every caisson project of that era.

They met the disease regardless of what they were paid to be there. Documentation of disease cases on the Delaware River Bridge project is incomplete. Medical records that would permit a comprehensive accounting of the injuries that occurred and the men who suffered them do not exist in any publicly accessible archive in a form widely cited by researchers. What the construction records do show is that the caisson work was finished on the schedule the contract demanded, that the foundations reached the bedrock the borings had identified as bearing material, and that the concrete poured into the caissons formed the base on which the towers were built.

What the construction records do not show, because the records of 1922 were not required to show it, is the full account of what the compressed-air work cost the men who did it. The towers themselves were raised by ironworkers. A different workforce with a different skill set and a different set of risks. The steel structure of a suspension bridge tower climbs from the foundations through 380 feet of open air.

It climbs from the bottom up. That means the men bolting steel at the top of the tower work 380 feet above the river on structural members not yet fully connected to the members below them, on connections that are not yet the final connections the design calls for. They work on temporary platforms whatever weather the Delaware River sends, which in winter means wind sweeping off the open coastal plain of New Jersey, at temperatures that make bare metal too cold to grip with bare hands except briefly, and that briefness is the heart of the work. You cannot finish a structural steel connection wearing gloves.

The tolerance on bolted connections in high-strength steel is too tight for gloves to serve as a practical tool for the men doing that work. The men who built the towers of the Delaware River Bridge worked bare-handed on steel in winter at heights where any slip in balance or any lapse in concentration was fatal. The main cables of a suspension bridge are not manufactured in a single process. They are built in place on the structure by a method called aerial spinning, in which individual steel wires are carried back and forth across the gap by a spinning wheel running on a temporary cableway, laying one wire at a time.

The cable is built up from individual wires until the full count the design specifies is complete, then the bundle is compacted and bound into the circular cross-section the design requires. The main cables of the Delaware River Bridge hold 18,666 individual steel wires, each 0.196 inches in diameter, each galvanized to resist the atmospheric corrosion the cable would face over the life of the structure. The spinning operation laid those 18,666 wires in succession across the 1,750-foot main span, with additional passes over the side spans from the towers to the anchorages on each shore.

The spinning crews worked both on the aerial cableway that carried the spinning wheels and on temporary footbridges hung beneath the cable line, from which the spinning work was observed, adjusted, and kept running. Those footbridges were temporary structures built only strong enough to hold the men standing on them, and they offered no shelter from the weather the Delaware River produces at that elevation. The wind across the main span of a suspension bridge under construction is not the wind you feel at street level. Two hundred feet above the river, with more than two thousand feet of open water to windward, the southwesterly winds that rule Philadelphia’s summer weather come through without the buildings and terrain that break them down below.

The men worked those footbridges through cable spinning in those winds, with the equipment the job demanded and the protection the era offered, which was a canvas work jacket if a man happened to own one, all the while knowing that a spinning wheel jumping its track could strike a man off the footbridge with no warning at all. How many men died building the Delaware River Bridge is not set out prominently in any source the public can consult. Fatality records from the early 1920s fell under state labor laws that demanded reporting to the proper labor department, but nothing in those laws required publication in any form a member of the public or a historian could readily reach. The bridge-building trade of that time treated worker deaths as a cost of doing the work, entering them where the law insisted, notifying the authorities when it was called for, and carrying on.

The men who fell from the towers, the footbridges, or the cable-spinning rig were written into whatever record system Pennsylvania or New Jersey kept for such events. Those records, where they have lasted through the past century at all, appear in no widely read account of the Delaware River Bridge project. The anchorages that hold the main cables against the pull of the loaded span are concrete blocks big enough to count as engineering projects in their own right. The Pennsylvania anchorage holds roughly 85,000 tons of concrete.

The New Jersey anchorage holds roughly 55,000 tons. The anchor blocks were poured in place inside excavations dug down to the bearing material the engineers had located, and the steel cable eyes that take the cable strands at the anchorage end are set into those concrete blocks, so the pull of the cable passes into the anchor block and from there into the ground, instead of letting the cable haul the tower back over its base. The concrete in these anchor blocks has served without interruption since 1926. It has not shifted.

The suspension cables carry the dead weight of the deck and the live load of traffic through suspenders—vertical steel rods—down to the stiffening truss that runs along both sides of the roadway across the full length of the main and side spans. The stiffening truss is not something older suspension bridge designs included. It entered suspension bridge practice after earlier long-span bridges showed that a deck hung from cables with no stiffening element tends to oscillate under dynamic loads. Wind loads, traffic loads, the sort of loads a major urban crossing carrying mixed vehicle and transit traffic generates without pause.

The engineers who laid out the Delaware River Bridge knew that a 1,750-foot main span carrying the traffic volumes expected at a crossing of this scale needed a stiffening truss deep enough to resist the dynamic loads from traffic and wind without excessive deflection or oscillation. The stiffening truss of the Delaware River Bridge is 25 feet deep. It shows plainly from the river. It is the visual element that sets the bridge’s silhouette apart from the slimmer look of later suspension bridges that found more elegant answers to the same structural problem.

The transit tracks built into the bridge’s original design reflect the transportation planning assumptions of 1920. In 1920 the engineers and transportation planners of Philadelphia and Camden took it for granted that an urban crossing of this size would carry both automobiles and transit trains. Because in 1920 the rail transit systems of both cities were still carrying passenger numbers the automobile had not yet taken away, and was not expected to take away. The bridge was designed with two transit tracks on the lower level of the stiffening truss, with clearance for the electric railway vehicles run by the transit systems of Philadelphia and Camden.

The bridge went on carrying transit for decades after it opened. It still does, in modified form. The PATCO Speedline uses the lower level of the bridge to move rapid transit passengers between Philadelphia and Camden over tracks the engineers of 1920 foresaw without knowing what the system would one day be called. The bridge opened on July 1, 1926.

The opening ceremony was arranged by the Delaware River Joint Commission and the civic authorities of Philadelphia and Camden. President Calvin Coolidge took part from a distance, pressing a gold telegraph key in Washington that sent an electrical signal to the bridge’s opening ceremony on the Philadelphia side, which counted as the official declaration of its dedication. The bridge was open. It was the longest suspension bridge in operation anywhere in the world.

The newspapers of Philadelphia and Camden and the national wire services covered the opening the way engineering achievements of that scale were covered in 1926: with the facts of the structure front and center—its length, its cost, its number of workers—and with the civic pride a project of that investment stirs in the cities that commissioned and paid for it. Construction cost came to roughly $37 million, financed through bonds the Delaware River Joint Commission issued against the bridge’s expected toll revenues. The toll at opening was 25 cents per vehicle. Traffic in the early years of operation ran ahead of the projections the commission had given bond buyers.

Debt service was met. The bonds were paid off in full. The commission kept operating the bridge on the toll revenue road users paid. The men who built the bridge were paid out of the construction budget funded by the $37 million.

The caisson workers on the Pennsylvania side, who breathed compressed air at a pressure thirty pounds per square inch above atmospheric in shifts of four to six hours, drew the wage compressed-air workers commanded in the construction market of 1922. The ironworkers who raised the steel towers 380 feet above the Delaware River earned the ironworker’s wage set by the Philadelphia labor market of 1922. The laborers—the men who moved materials, kept up the site, and did the tasks that carried no recognized trade classification—earned the common labor rate of 1922, below the ironworker’s rate by a margin that reflected their place in the work hierarchy. And the men at the bottom of that hierarchy were mostly those whose position in the larger social order of the 1920s held them at the bottom of the work hierarchy as well.

Whether such pay was enough for the labor and the hazard is something the payroll records can shed light on but cannot settle once and for all. Those records sit in the archives that hold the papers of the contractors who carried out the construction. Whether they can be reached, and whether scholars have drawn on them to piece together the makeup of the workforce, goes unmentioned in any of the widely read histories of the bridge. The commissioners’ and engineers’ names, by contrast, turn up in the administrative record of the Delaware River Joint Commission.

Ralph Modjeski’s name is written into the design files and into the professional literature of bridge engineering. Calvin Coolidge’s name is written into the account of the opening ceremony, since the president pressed a telegraph key in Washington on July 1, 1926. The names of the caisson crews, the ironworkers, the cable spinners, and the ordinary laborers survive in the payroll ledgers of the contractors who hired them, in whatever shape those ledgers have lasted a hundred years. The bridge is still standing.

Roughly 100,000 vehicles a day cross it over 1.8 miles of the Delaware River between Philadelphia and Camden. Its 1,750-foot main span held the world record for five years, until the George Washington Bridge opened in 1931 at 3,500 feet, which turned the Delaware River Bridge’s claim to fame into a footnote of history rather than a living fact. Today the Delaware River Bridge goes by another name—the Benjamin Franklin Bridge, retitled in 1956 for a man who had no hand in building it.

The cables are blue, and have stayed blue through most of the bridge’s existence, since the Delaware River Port Authority settled on a shade for its repainting cycles, and that shade became how the bridge looks to the people who live near it, drive across it, and watch it from the water. At the span’s midpoint, 380 feet above the river, the main cables that the spinning crews built wire upon wire in 1924 and 1925 bear the deck and the traffic beneath them, and pass that load on to the towers the ironworkers raised in 1922 and 1923. From the towers the weight descends to the foundations the caisson crews sank to bedrock inside pressurized chambers at the river’s bottom, under conditions the river did not give up easily and the men entered only knowing the cost. The river flows on under the bridge.

The tide rolls in from Delaware Bay. This is not the water of 1922. The concrete of the foundations is, and so is the steel of the cables. The men who put them there are not.

The bridge stays open. Traffic keeps moving. The commission runs it. Southbound, a passenger vehicle pays five dollars in toll.

At the speed limit the crossing takes roughly four minutes. Halfway across, you stand 380 feet above the Delaware River on prestressed concrete slabs set on structural steel girders hung from cable suspenders twisted from 18,666 separate galvanized wires, spun over 1,750 feet of open air by men working on temporary footbridges in the wind sweeping up the Delaware Valley in 1924. The cables remain under tension. What they hold is your weight, the weight of every vehicle crossing alongside you, and the weight of every vehicle that has crossed since July 1, 1926.

The cables have never given way. The foundations have never shifted. The men who built them are recorded in the payroll ledgers of the contractors the commission engaged.

Their names are absent from the bridge.

Related Posts

In 1900, guests at the Holloway Hotel in Newton County, Arkansas, kept vanishing from the same three rooms on the eastern wing. Seamstress Mary Carver left her sewing kit behind. Bible salesman…

The scratching started again around midnight, constant now, and Mary Ellis knew she would not sleep. She lay in her narrow room at the end of the third-floor corridor and listened to the sound working its way up through the building’s bones, a rhythmic scrape, scrape, scrape that came from somewhere below the floorboards. Mr. … Read more

In the 1980s, a high school rumor could travel through an entire building by lunchtime without a single text, group chat, or post. Someone whispered “after school, by the bleachers,” and the whole…

The whole school was already there by the time the circle closed. No one had sent a single message, no group chat existed, no one had posted anything anywhere, yet by lunchtime everyone knew the fight would happen after last bell, next to the bleachers. That was how news traveled then: whispered from locker to … Read more

In 1950, Roy Cox spent eight months building a tiny engine from scratch, holding tolerances of 25 millionths of an inch—any piston that deviated went straight in the trash. The Cox 049, a working…

The sound carried three backyards on a Saturday morning without even trying. Thin and slightly wrong, like something spinning faster than it had any right to. If you grew up anywhere in America between 1955 and 1985, you knew exactly what it was. It was the Cox 049, a working internal combustion engine machined to … Read more

In November 1909, authorities in Shannon County, Missouri, entered the Warren homestead and found the beds made, the pantry stocked, and a half-written letter on Thomas Warren’s desk. Thomas and…

Idaho Press-Tribune, October 17, 1907—that was the date stamped on the clipping, but the story itself was older, and stranger, and it began long before the newspaper ever touched it. It began, as so many things do, in the dark of a Missouri autumn. In the autumn of 1909, when the leaves turned copper and … Read more

In March 1923, Clarence Saunders cornered Wall Street itself. Working through a broker and southern banks, the Memphis grocer quietly bought nearly ev…

In the summer of 1923, on a hill at the eastern edge of Memphis, a half-finished mansion of pink Georgia marble rose against the sky. The man who ordered every stone placed there walked to the gate, handed the keys to his creditors, and never lived in the house. His name was Clarence Saunders, and … Read more

In 1848, Samuel Knap’s men dug 18 feet into a filled-in pit near Michigan’s Ontonagon River and struck a single mass of nearly pure copper—six tons of it. But the copper wasn’t lying on the floor….

The copper tool came out of a mining pit in Michigan and went to a laboratory. The lab returned a date of 8,500 years old. Hold that number, because it breaks something. That tool was already ancient when the first pyramid in Egypt was still only an idea in someone’s head. It was already old … Read more

Leave a Reply