In the summer of 1910, a blaster bored a row of holes into a granite wall towering over the Skeena River in northern British Columbia, charging each with dynamite as he crept along a narrow rock shelf

During the summer of 1910, a powder man working the south side of a granite bluff above the Skeena River in northern British Columbia cut a series of boreholes with a steel drill, continuing holes his partner had begun at first light. One after another he packed dynamite into them, inching along a level rock ledge roughly eighteen inches wide that ran between the cliff and the drop. Depending on where he planted his feet, that ledge dropped forty to eighty feet to the water beneath. He tamped down each charge, touched off the fuse, and retraced his steps along the ledge to the cleared ground.

Thumbnail

The explosion sheared away a stretch of the cliff down to the river and opened the ledge out to the width the engineers had called for. He stepped onto the newly exposed rock and started drilling once more. The water below was the Skeena. The wall above was the flank of the Skeena River canyon, the reach where the outer Coast Mountains choke the river into a tight channel of swift water and sheer stone, in country with no roads and none of the settlements the construction trade would have recognized, save for the villages of Indigenous people who had harvested Skeena chinook salmon for thousands of years before any surveyor laid eyes on the valley.

What was rising along the Skeena’s southern bank that summer of 1910 was a railway hewn into rock walls, carried over tributary creeks on timber spans, and punched through mountain formations in short tunnels wherever the cliff left no usable shelf at all. The railway was the Grand Trunk Pacific. The crews building it were paid by the piece and by the day by a contracting outfit named Foley, Welch and Stewart. The route followed the Skeena valley for roughly 180 miles, and it stood as the costliest railway construction undertaking Canada had seen to that point.

The company that bankrolled the railway went under before it had finished even its first term of service. The line through the Skeena valley remains in place, and trains still travel it. It became the main line of the Canadian National Railway, which absorbed the failed Grand Trunk Pacific in 1920 and has run the route without interruption for the century since. Today container trains cross the Skeena valley on the very road that powder crews chiseled into those slopes above the river in 1910.

They cross at weights and speeds that neither the engineers who surveyed the route nor the men who built it could have conceived of handling. The valley takes the passage the way it took everything the river, the railway, and the century hurled at it, with no visible strain or response, the way any soundly built structure bears what is set upon it. This is the account of how the Grand Trunk Pacific Railway drove its western line through the Skeena River valley in northern British Columbia between 1908 and 1914. It is the account of the most remote and technically punishing stretch of the last transcontinental railway ever built across Canada.

It is the account of immigrant laborers from Italy, Greece, and Scandinavia, and of First Nations men who carved that slope from the canyon walls above a river that could rise suddenly and without warning, in country where the closest supply depot lay three days upstream by steamboat and the closest hospital lay farther yet. It is the account of a railway erected on financial hopes its own president privately questioned, a president who did not survive to see it completed. He died in the North Atlantic in April 1912, midway through the Skeena construction season, and the railway he had helped bring into being kept pushing north and west without him until the last spike went in during 1914 under conditions nobody recorded in photographs, because the funds had dried up and the financiers were starting to grasp that they would not be recovered. To grasp why the Grand Trunk Pacific Railway built a line through the Skeena River valley in 1910, one has to grasp what the Grand Trunk Railway was, what it believed about the future of western Canada, and why that belief seemed sound enough in 1903 to organize an entirely new transcontinental railway, finance it, and drive it across some of the most forbidding mountain country in North America, on the strength of projections the region itself would later refute.

The Grand Trunk Railway was the oldest of Canada’s major railways. It had been laid across southern Ontario and Quebec in the 1850s and 1860s with British money hunting returns in the colonial transport market. By the start of the twentieth century it was the leading carrier in central Canada, stretching from Portland, Maine, through Montreal and Toronto to the Michigan border, where it met American lines that opened the American Midwest to it. It was a British-financed railway run from London, with an administrative setup that mirrored its shareholders’ priorities: operating efficiency and dividend payouts rather than regional expansion into territory where traffic volumes had yet to settle.

In 1900 the Grand Trunk’s standing was solid within the territory it covered and geographically confined inside that range. What shifted the calculations in the early years of the new century was the peopling of the Canadian prairies. The Dominion Lands Act and the aggressive immigration drive conducted by the Department of the Interior under Clifford Sifton packed the prairie provinces with settlers from Ukraine, Germany, Scandinavia, and Eastern Europe at a pace that strained the Canadian Pacific Railway, at the time the only transcontinental line. Wheat shipments through the Great Lakes climbed to volumes that signaled prairie settlement was no passing agricultural experiment but a lasting remaking of the interior.

The wheat would keep flowing, the settlers would remain. A railway reaching the prairies from central Canada and running west to a Pacific port would haul an immense volume of transcontinental freight, a volume that looked enormous by the standards of 1903, big enough, it was argued, to warrant the expense of building a new transcontinental line through country no railway had ever crossed. Charles Melville Hayes was president of the Grand Trunk Railway. Born in Rock Island, Illinois, in 1856, he had arrived at the Grand Trunk from the Wabash Railway, where he had overhauled the operations of a struggling Midwestern line and brought it back to financial health through a blend of cost cutting and route rationalization that the railway trade press of the 1890s cited as a model of managerial efficiency.

He carried to the Grand Trunk that same pairing of operational precision and strategic ambition. He recognized that the Grand Trunk’s position in central Canada was strong but hemmed in geographically. A transcontinental extension, laid out along the most technically sound route through the lowest mountain pass, with a new Pacific terminus at a port better placed than Vancouver on the great circle route to Asia, would turn the Grand Trunk from a regional Canadian carrier into a genuine contender in Pacific trade. That conviction was sufficient to wager the Grand Trunk’s financial standing on it.

Hayes settled on Prince Rupert, situated on Kaien Island close to where the Skeena empties into the sea. At the time, Prince Rupert was not a city at all. It was a deep-water anchorage set near the shoreline, and on the great circle route to Asian ports it lay roughly 500 miles nearer than Vancouver. At 1903 shipping rates, those five hundred miles of open ocean amounted to a competitive edge solid enough to anchor a railway on.

Hayes was convinced of it, and the bond market came around to the same conclusion. The Grand Trunk Pacific Railway was incorporated in 1903 to construct a line linking Winnipeg with Prince Rupert. Construction started on the eastern portion in 1905, and on the western portion, the segment stretching from Winnipeg to the Pacific, in 1908. The western portion extended about 1,754 miles from Winnipeg to Prince Rupert and went through the Rockies at Yellowhead Pass, at 3,717 feet the lowest crossing of the Rockies open to a Canadian transcontinental railway.

Once past the Rockies, the route dropped through British Columbia’s interior plateau, following the valleys of the Nechako and Bulkley rivers before swinging northwest toward the Skeena. The Yellowhead crossing posed comparatively little trouble. Supplying the interior plateau stretches was hard, since they were remote and short of provisions, but the ground itself was workable. The Skeena valley was another matter.

The Skeena River drains roughly 54,000 square miles of northern British Columbia. It begins near the Continental Divide and flows northwest and then west for about 360 miles before it reaches tidewater at Prince Rupert. Through its upper and middle courses it is a wide mountain river running along valley floors, so a line could practically follow either bank. But in the stretch where it slices through the outer ranges of the Coast Mountains, some 100 miles from the coast, the river becomes something else entirely.

The valley walls press inward. The river tightens and speeds up through a succession of gorges that thousands of years have carved into the granite and metamorphic rock of the outer Coast range. The deepest and longest unbroken of these gorges stretches from Kitselas Canyon, where the river has cut its way through a mountain range, to the tidal flats near the coast, a distance of about eighty kilometres. Along this stretch there is no valley floor at all, only water and stone.

On both sides of the valley, cliff faces climb from the water’s edge to heights of thirty metres or more. During flood season, the gap between the river and the foot of the cliff is simply the river itself. Any railway aiming to reach Prince Rupert harbour had to get through this canyon. The walls on the north bank were steeper than those on the south.

The south bank provided somewhat more rock shelf and a somewhat better prospect for blasting crews to operate. The advantage was slight. The engineers selected it because no other route existed. The Grand Trunk Pacific’s chief engineer directed the western division through division engineers, each responsible for particular sections.

Survey parties laying out the centre line of the Skeena section worked the canyon through the winters of 1905 and 1906, tracing the route across cliff faces and through snow, marking the spots that would need blasting, noting the tributary crossings that would require bridges, and identifying the mountain formations that would require tunnels. The survey established what had to be built. The contract with Foley, Welch and Stewart established who would build it. Work on the canyon sections started in 1908 and ran for four construction seasons until grading was finished.

Foley, Welch and Stewart was western Canada’s foremost railway contracting firm in the early decades of the twentieth century. John Whitfield Foley and his partners had built large stretches of the Canadian Pacific Railway’s branch line network across the prairie provinces and had developed the organizational ability to move men and equipment through country without infrastructure. The Grand Trunk Pacific Western Division was the biggest single contract the firm ever undertook. The Skeena Canyon section cost the most per mile, the section whose expense ran past estimates before it was finished.

The workforce Foley, Welch and Stewart gathered for the Skeena Canyon sections came from the pool that British Columbia’s construction industry relied on in 1908 for heavy work in remote terrain. Italian immigrants made up the largest group. Italian men had been reaching British Columbia in growing numbers since the 1890s, taking construction, mining and harbour jobs across the province, following the patterns of Italian labour migration throughout North America in the early industrial era. They found work through a labour market organized in part around the padrone system, under which a labour contractor, typically a man fluent in both Italian and English with established connections to construction firms, recruited men from Italian immigrant communities in eastern cities or straight from Italy and contracted them in bulk to the construction company.

The construction firm paid the padrone for organizing the labour, and he took a share of the men’s wages as commission. Men who arrived through the padrone system reached a work camp in northern British Columbia having accepted terms the padrone had negotiated for them in a language they did not speak, with a company operating under laws they had not had time to learn. The premium canyon workers received over construction work on the interior plateau reflected the added risk of labouring in the canyon. Whether that premium matched the risk was a question the accounts never resolved.

Greek immigrant workers made up a second notable presence in the canyon sections. Scandinavian workers, Finns and Swedes in particular, were in the camps as well. Part of the general labour force came from First Nations men of the Tsimshian and Gitxsan peoples, whose territories the railway crossed and whose villages stood along its route. For thousands of years, the Skeena had been the geographic and economic foundation of the Tsimshian and Gitxsan.

The salmon runs the river carried, the largest on the British Columbia coast, were the material basis of an economy and culture that had thrived in the valley. The Grand Trunk Pacific drove a grade along the river for longer than the concept of a bond market had existed anywhere on earth. What the Skeena grade meant for the communities the line passed through was recorded in the placement of their villages and fishing grounds in the Grand Trunk Pacific’s records, to the extent those records of 1910 preserved it. The men from those communities who worked on construction show up in the labour costs, not as men.

That is not something peculiar to Grand Trunk Pacific records; it is how the historical record of Indigenous labour in Canadian industrial construction in the early twentieth century is structured. Supply was the first problem of construction, and it was so basic that construction could not start until it had been partly solved. There was no road in the canyon. In 1908 there was no road anywhere in the Skeena watershed that a construction operation of this size could use to move material from the coast inland.

The river served as the road. Sternwheel steamboats had navigated the Skeena since the 1890s, hauling supplies to interior trading posts, missions, and occasional mining operations, threading a channel that shifted with every seasonal flood and demanded local knowledge of details no map could convey. The vessels deployed on the Skeena construction were flat-bottomed, shallow-draft boats with a stern paddle wheel, purpose-built for the river conditions of the British Columbia interior, able to handle fast water and gravel bars and confront the submerged hazards of a system fed by ice that reshaped its channel each spring. The captains of the Skeena sternwheelers during the construction years drew on experience built up over years of navigating the river individually.

The channel a captain knew in August at low water was not the channel he would encounter in June at flood. Hazards that could be passed in one season might be impassable the next. A man who had ascended the Skeena hundreds of times possessed knowledge of the river under specific conditions that the construction manager scheduling supply runs from Winnipeg did not have, and the construction manager’s schedule was revised when the river forced revisions upon it. Construction camps were established at regular intervals along the river as the supply line extended, each camp serving a section of the river and each relying on the steamboat schedule for food, drilling equipment, explosives, replacement tools, and the thousands of other material needs of a large construction operation in a place where nothing was produced locally.

The housing in those camps was what construction firms in northern British Columbia supplied in 1908: timber buildings or canvas-and-frame shelters, sufficient to keep men at the work site and suited to the work required. They were not built for a northern British Columbia winter. The Skeena valley in winter is not the Skeena valley in summer. Temperatures in the canyon drop below freezing for months.

River ice forms along the channel edges and across the tributary streams. Snow gathers on the cliff faces above the work ledges, then releases suddenly when temperature or snow load crosses the threshold of failure. An avalanche from a cliff face onto a work ledge in 1910 was not something the crew on the ledge below survived. How much the men on the lower ledge could see of the conditions building above them depended on visibility, which was not always sufficient in a canyon with walls a hundred feet high in winter cloud to make a timely assessment.

The working season in the canyon sections was bounded at both ends by the river. The Skeena’s spring flood, fed by snowmelt from the 54,000-square-mile watershed, usually peaked in late May or June. At flood level, the river through Kitselas Canyon ran at velocities and volumes that endangered any fixed surface within reach of the current and raised the water surface against the cliff faces far above the normal water line. The rock ledges cut at the required elevation, which had been calculated to keep the railway above the normal flood level, sat at or below the flood surface when the June peak arrived.

The blasting and drilling crews working those ledges in May were working toward a river that would reach their elevation within weeks. When the flood came, they left the ledges. Work in the canyon stopped in the sections the flood reached. The men waited for the river to drop.

The delay was not in the construction schedule Foley, Welch and Stewart had submitted to the Grand Trunk Pacific’s engineering department. The schedule had been based on survey data and river gauge records covering the period for which such records existed, a relatively short period, which yielded an average of flood behaviour that might or might not match the actual flood in any given year. The 1908 flood exceeded the average. The 1910 flood exceeded the average markedly.

Every year with a higher-than-average flood was a delay to the schedule in the affected sections, producing cost overruns the contract had no provision for absorbing and the Grand Trunk Pacific absorbed anyway, because the alternative was stopping the work. The Grand Trunk Pacific’s finances in 1910 did not comfortably absorb unplanned costs, but it absorbed them because building the railway was necessary. Work on the cliff face sections continued by the methods that large-scale rock excavation required in 1910. A pneumatic rock drill, powered by compressed air from portable compressors brought up the river on sternwheelers, drilled holes in the cliff face to the depth required to form a ledge of the specified width when the charge was fired.

The drill worked in pairs, one man holding and turning the drill steel, another operating the feed mechanism and watching the air pressure, both standing on a ledge whose width was the product of the previous blast, exactly eighteen inches or a little less. On the Skeena canyon cliff faces, unlike a tunnel where three walls provided a fixed working platform, the men drilling the next section stood on the surface the last blast had made. The surface was not always level and not always the specified width. It was what the blast had made.

The charges used in the canyon sections were dynamite and black powder in proportions set by the powder supervisor according to the character of the rock at each specific location. The granite of the outer Coast range is a coarse crystalline rock, resembling other hard crystalline rocks in its behaviour under explosives. It resists drilling, is unpredictable in its fracture pattern, and tends to split along crystal boundaries that do not follow the lines chosen by the powder man. A blast designed to produce a clean ledge of specified width in homogeneous granite might produce a ragged ledge requiring additional excavation, or overbreak requiring a second charge to remove, or a section of face that held while surrounding material fell away, leaving a knob the next drilling crew had to work around.

Empirical knowledge of how a particular section of cliff face would behave under a particular charge accumulated with the powder supervisors over the construction season as they worked along the line. Knowledge that applied to the section above the last tributary crossing did not transfer automatically to the section below it, because the rock changed and the geometry of the canyon changed, and the relationship between charge and result had to be relearned each time. The man working on an eighteen-inch ledge above the Skeena when the adjacent section of cliff face gave way under the previous shift’s blast rather than at the moment of fuse ignition was in a position the Grand Trunk Pacific’s accident records detail only to the extent such records detail it. The casualty documents for the Skeena Canyon construction workers, as available in the archives of the period and in published railway histories, do not provide a complete accounting of the men killed or permanently disabled working the cliff face between 1908 and 1914.

The industrial legislation that governed how construction worker deaths were recorded in British Columbia in those years fell short of what a later era would demand, and the rules that did exist were applied unevenly at a worksite as far removed from Vancouver as Skeena Canyon was. What the records show is that the phase was finished. What they largely leave out is what it took from the men who built it. Where the tributaries came in, the work moved from blasting rock faces to raising timber bridges.

The streams that ran down from the interior plateau through the coastal ranges into the Skeena were modest in their dry-season flow. In flood, swollen by the same snowmelt that fed the Skeena, they became something else entirely. Creeks that lay ankle-deep over gravel in August ran bank-full and swift in June, hauling down what the upper watersheds shed: uprooted trees, slabs of cut bank, material torn from high slopes by the very snowmelt that was lifting the water. A bridge designed around dry-season conditions was a bridge the spring flood would put to a test that dry-season measurements had never anticipated.

The bridge engineers laid out the tributary crossings for the flood condition, since the only other choice was to rebuild them after the first June freshet. That meant the heights and spans of the bridges, which the base flow gave no clue to, were fixed from high-water marks on the canyon walls noted by survey parties and from flood records furnished by the Indigenous communities living along the river, the fullest and oldest accounts of how the Skeena floods that anyone had. The timber for the bridges came out of the forest next to the construction site. The Coast Mountain forests of the Skeena watershed are old-growth Douglas fir, Sitka spruce, and western red cedar, trees that had stood for centuries in a wet maritime climate with little disturbance.

The trees within hauling range of the construction camps were big enough to yield the structural members the bridge work called for. The felling crews turned out that timber as a by-product of clearing a right-of-way through the old growth. Mill operators at each camp sawed the logs into sills, caps, stringers, and longitudinal girders to the bridge carpenters’ specifications. The bridge carpenters formed a workforce of their own, distinct from the general grading and drilling crews that advanced along the line of work, raising the crossings in whatever order the grade demanded.

The skills this crew carried were specialized enough that the general labour force could not fill in for them when the need arose, and scarce enough in the canyon country that finding replacements when they moved on was no simple matter. The eleven tunnels in the canyon section were bored by the hard-rock methods in use in 1910. A drilling crew attacked the face on a pattern the powder supervisor set to match the geological makeup. Those patterns called for perimeter holes to shape the tunnel, cut holes at the centre of the face meant to break the rock inward toward the opening those holes created, and trimming holes to clean up the perimeter.

The pattern was tuned to the rock type at each face, which meant tuning it again at every face, since the rock was not uniform over 180 miles of line. Once the blast went off, a mucking crew cleared the broken rock from the heading with hand tools and small rail cars shoved by hand out to the portal and dumped. Then the cycle began again. In the hard granite stretches of the Skeena tunnels, advance ran from eight to twelve feet per tunnel per day when conditions permitted.

When the formations turned irregular, or when a fault in the compressor line from the surface cut the compressed air feeding the drills, or when water draining through the tunnel ran worse than usual, the advance rate dropped. The men at a tunnel heading in 1910 worked in air thick with rock dust, with powder smoke from the blast, and with the exhaust of the carbide lamps that gave them light to work by. The silica dust kicked up by drilling granite went into the drilling crews’ lungs with every breath. Silicosis, the condition caused by silica building up in lung tissue, was familiar to physicians, and its link to hard-rock tunnel work had been set down in the medical literature of the day.

The legal instruments that bound construction companies doing tunnel work in British Columbia in 1910 were not the sort that meaningfully altered conditions underground in the Skeena district. The men breathed whatever those headings held, which was whatever hard-rock tunnel work in 1910 gave off. By the close of the 1912 construction season, the grade through the Skeena valley stood substantially finished. Charles Melville Hayes did not live to see it.

He left Southampton aboard the RMS Titanic on 10 April 1912, coming back from a journey to London and Paris, where he had been meeting the Grand Trunk’s British shareholders about the railway’s finances. Those finances were not what the 1903 projections had promised. Construction costs on the western division had run past the original estimates by a margin that widened with each annual accounting. Prairie settlement was moving ahead at full speed, but the traffic forecasts for a second transcontinental railway through territory the Canadian Pacific already served had never been revised upward to match the optimism of 1903.

Hayes could see the distance between expectation and reality, and he was in London trying to close it. He sailed into the North Atlantic on the night of 15 April 1912, and the Grand Trunk Pacific carried on westward without him. The railway that went on without its president ran on financial momentum that his death did not halt, but the economics underlying the line worked against it. Through the 1912 and 1913 seasons, the track-laying crews on the western division kept pushing toward Prince Rupert.

The sternwheel supply boats on the Skeena kept hauling material up to the forward camps. The tunnel crews finished the last of the canyon’s eleven tunnels, and the bridge carpenters completed the final timber trestle crossings along with the stone masonry piers at the larger spans. The grading crews finished surfacing the ledge tops on the last stretches of cliff face. The work got done because Foley, Welch and Stewart was held to a contract that required it, and because the men in the camps along the Skeena were paid at whatever rate and under whatever labour arrangement had drawn them to that canyon to do that work.

The completion ceremony for the Grand Trunk Pacific Railway took place on 7 April 1914 at Fort Fraser, British Columbia, where the eastbound and westbound construction crews drove the last spike. No press photographer of national standing was there. No federal cabinet minister was there. No gilded ceremonial spike was set in place.

The ceremony drew Foley, Welch and Stewart’s management staff and Grand Trunk Pacific officials, men whose names turned up in the local newspaper coverage of the event and who knew, as they drove the spike, that the railway they were finishing had already cost more than any realistic traffic forecast could ever return. The spike went in on a Tuesday morning in April 1914, four months before the First World War began, two years after the death of the man who had put the project together in the Atlantic, and some unrecorded number of years before the bond market formally conceded what the operating figures were already demonstrating. The Grand Trunk Pacific went bankrupt in 1919. Five years of revenue-earning operation set against the debt the construction had created left a deficit that no trimming of operating costs could erase.

The federal government, which had guaranteed a portion of the bond issue in the original financing, ended up the effective owner of an insolvent transcontinental railway. In 1920 it formed the Canadian National Railway to fold together the Grand Trunk Pacific and the other ailing lines it had collected through its construction commitments. The Grand Trunk Pacific was absorbed into the Canadian National Railway. The Grand Trunk Railway itself, the parent company, was swallowed up in 1923.

The railway Charles Hayes had built to rival the Canadian Pacific was nationalized into a system that contained its competitor as well, and it ran as a public utility rather than a profit-making venture. The line through the Skeena valley became the Canadian National main line to Prince Rupert. It carried whatever it carried, enough freight to justify running the line as part of a national system that does not weigh individual segments against individual financial projections. The port Hayes had picked for its great-circle advantages to Asia eventually turned into what he had expected.

It arrived decades later than the projections had suggested, through operations in which the Grand Trunk Pacific played no part. Prince Rupert today ranks among Canada’s major bulk shipping terminals, moving containers, coal and grain in volumes that have climbed sharply in the twenty-first century as trans-Pacific trade has expanded. It is served by the Canadian National line, which reaches Prince Rupert through the Skeena valley along the grade cut into the cliff faces above the river between 1908 and 1914. Drive the Yellowhead Highway west from Prince George toward Prince Rupert today and you follow the Skeena through the canyon stretch for the final hundred miles of the journey.

The highway, put through in the 1950s, runs along the north bank. The railway runs along the south bank, where the blasting crews opened the ledge out of the cliff face in 1910. From the highway you can see the grade across the river. The cut rock surfaces have weathered to the grey that Coast Mountain granite takes on after a century of rain, frost and marine humidity.

The timber bridges over the tributary streams have given way to steel and concrete structures on the alignments the bridge carpenters laid out in 1910. The rock itself, the ledge surface the powder worker’s blast carved from the cliff face in the summer of 1910, is the surface the trains still run on. A Canadian National freight train bound west for Prince Rupert crosses the canyon at a total weight and speed the 1910 drilling crews could never have imagined, and the grade carries it without structural strain traceable to the design or construction of the canyon section. For 115 years the cliff face above the grade has been weathering at the pace the Coast Mountain climate weathers the region’s granite.

For 105 years the grade below it has been taking freight trains at whatever rate the Canadian National Railway sets. That schedule is enough for the port of Prince Rupert, which handles the traffic Charles Hayes believed it would handle, traffic the Grand Trunk Pacific no longer existed to carry by the time it came. Near Kitselas Canyon, in a stretch where the original blast line still shows as a shift in the weathering pattern on the cliff face, the track bends slightly to follow the contour of the canyon wall as the survey party plotted it in the winter of 1906. The powder worker who worked that section in the summer of 1910 followed the survey line as he drilled, loaded, fired and moved on.

He worked his way along that curve over however many shifts the section demanded. The cliff-face work paid piecework, higher than the daily wage for interior plateau work, since the canyon work was reckoned more dangerous. He was paid on the pay periods of the Foley, Welch and Stewart camp payroll, which differed from camp to camp. His name appears in the Foley, Welch and Stewart accounts to whatever degree of precision the records kept.

Had he come in through the padrone system, his name may sit behind the padrone’s name in those records, or may not appear at all below the level of the padrone’s total payments. If he was Indigenous, from the Tsimshian or Gitxsan communities whose territories took in that part of the canyon, his name shows up in the records at whatever level the 1910 accounts thought worth recording, a question the published histories of the Grand Trunk Pacific do not fully answer. History books mention the Grand Trunk Pacific Railway at the level history books mention things. Charles Hayes’s name turns up in the Titanic accounts, in railway histories and in the Dictionary of Canadian Biography.

His name is tied to Port Edward, near Prince Rupert, and to the institutional memory of the Grand Trunk. Foley, Welch and Stewart are named in construction records and in the history of western Canadian railway companies. The railway’s route through the Skeena valley is credited to the Grand Trunk Pacific’s engineering department in the technical construction reports. The Italian workers who ran the pneumatic drills on the cliff faces above the Skeena in 1910 are mentioned in those reports at the level the accounts of that year preserved.

The Greek workers who mucked out the tunnel portals are mentioned at the same level. The First Nations men from the Tsimshian and Gitxsan communities who worked on construction are mentioned at the level the 1910 accounts considered worth preserving, which was a lesser level. The man who was on the ledge when the adjacent section of cliff face gave way under the previous shift’s blast, rather than at the fuse burn, has his name in the Grand Trunk Pacific’s construction accident records, to whatever extent those records exist and can be reached. The powder worker who worked the section above Kitselas Canyon in the summer of 1910, whose blast produced the curve the Canadian National trains still follow today, is named in no widely published account.

The grade is still there, and the trains still cross it. The blast line the powder worker left in the cliff above the Skeena in the summer of 1910 can be seen from the highway on the opposite bank, by those who know what they are looking at. It has been there for 115 years.

Related Posts

In 1900, guests at the Holloway Hotel in Newton County, Arkansas, kept vanishing from the same three rooms on the eastern wing. Seamstress Mary Carver left her sewing kit behind. Bible salesman…

The scratching started again around midnight, constant now, and Mary Ellis knew she would not sleep. She lay in her narrow room at the end of the third-floor corridor and listened to the sound working its way up through the building’s bones, a rhythmic scrape, scrape, scrape that came from somewhere below the floorboards. Mr. … Read more

In the 1980s, a high school rumor could travel through an entire building by lunchtime without a single text, group chat, or post. Someone whispered “after school, by the bleachers,” and the whole…

The whole school was already there by the time the circle closed. No one had sent a single message, no group chat existed, no one had posted anything anywhere, yet by lunchtime everyone knew the fight would happen after last bell, next to the bleachers. That was how news traveled then: whispered from locker to … Read more

In 1950, Roy Cox spent eight months building a tiny engine from scratch, holding tolerances of 25 millionths of an inch—any piston that deviated went straight in the trash. The Cox 049, a working…

The sound carried three backyards on a Saturday morning without even trying. Thin and slightly wrong, like something spinning faster than it had any right to. If you grew up anywhere in America between 1955 and 1985, you knew exactly what it was. It was the Cox 049, a working internal combustion engine machined to … Read more

In November 1909, authorities in Shannon County, Missouri, entered the Warren homestead and found the beds made, the pantry stocked, and a half-written letter on Thomas Warren’s desk. Thomas and…

Idaho Press-Tribune, October 17, 1907—that was the date stamped on the clipping, but the story itself was older, and stranger, and it began long before the newspaper ever touched it. It began, as so many things do, in the dark of a Missouri autumn. In the autumn of 1909, when the leaves turned copper and … Read more

In March 1923, Clarence Saunders cornered Wall Street itself. Working through a broker and southern banks, the Memphis grocer quietly bought nearly ev…

In the summer of 1923, on a hill at the eastern edge of Memphis, a half-finished mansion of pink Georgia marble rose against the sky. The man who ordered every stone placed there walked to the gate, handed the keys to his creditors, and never lived in the house. His name was Clarence Saunders, and … Read more

In 1848, Samuel Knap’s men dug 18 feet into a filled-in pit near Michigan’s Ontonagon River and struck a single mass of nearly pure copper—six tons of it. But the copper wasn’t lying on the floor….

The copper tool came out of a mining pit in Michigan and went to a laboratory. The lab returned a date of 8,500 years old. Hold that number, because it breaks something. That tool was already ancient when the first pyramid in Egypt was still only an idea in someone’s head. It was already old … Read more

Leave a Reply

Your email address will not be published. Required fields are marked *