On May 5, 1886, a lone Norway pine caught between two rock outcrops at Devil’s Elbow on the St. Croix River, and within six hours, hundreds of thousands of logs had stacked against it. The jam…

The explosion traveled down the river valley like a deep, drawn-out rumble that refused to fade. It was June 24th, 1886, and the blast that ripped through the base of the log jam at Devil’s Elbow was the biggest charge any of the blasters had yet set off. Fifteen miles away, in Stillwater, Minnesota, the sound arrived before the news did. The men still standing on the timber felt the log beneath them start to move, and then the whole mass, a mountain of white pine that had blocked the St.

Thumbnail

Croix River for fifty days, began to shift. It did not come apart cleanly. It let go in sections, a central core releasing first, the logs groaning and grinding as the pressure of two miles of timber finally found an outlet. The movement set off a chain reaction.

More logs shifted, more sections tore loose, and the river started to flow again. The men on the jam dashed for the banks, jumping from log to log as the timber surged forward beneath them. Three men were carried downstream on the moving mass. Two reached shore a mile away.

The third, a river driver named Patrick Quinn, dropped through a gap in the logs. He was never seen again. Breaking the jam did not mean the work was done. It took three more days for the timber to move downstream in waves, hundreds of thousands of logs at a time, and when the river finally ran clear enough to see, a core section of the jam still remained at Devil’s Elbow, deep and tangled, a quarter mile of timber still blocking the channel.

The crews went back to work. They drilled more holes, set more charges, sawed more logs. The final section was broken in mid-July, fifty-seven days after the jam had first formed. When it was over, the St.

Croix Boom Company, the organization that managed the log drive, tallied the cost: over forty thousand dollars, more than a million dollars in today’s money. Six men confirmed dead. Dozens injured. An estimated ten to fifteen million board feet of timber lost, either shattered by the blasting or swept downstream and never recovered.

The town of Stillwater survived. The mills fired up their boilers, the saws began to turn, and the lumber that had been cut in the winter camps and sent down the river in the spring finally reached the market. The contracts were fulfilled, late, but fulfilled. But the cost of the jam, the largest ever documented in American history, had very nearly broken a regional economy and the men who risked their lives to save it.

The disaster did not happen in isolation. It was the result of a system operating at its absolute limit, and to understand what happened at Devil’s Elbow, you have to understand the river and the industry that had come to depend on it. The St. Croix River drains over seven thousand square miles of northern Wisconsin and Minnesota, and in the 1880s, that drainage was one of the most productive logging regions in the world.

The landscape was covered in old-growth white pine, pinus strobus, trees one hundred and fifty to two hundred years old, some older, standing a hundred feet tall with trunks three and four feet across. Straight, clean wood, perfect for dimensional lumber. Every town being built across the Great Plains, every farmhouse, every barn, every commercial building from Chicago to Denver needed white pine, and the St. Croix Valley was cutting it as fast as humanly possible.

The logging system was built on the river. The timber was cut in the winter, fifty, sixty, sometimes a hundred miles upstream from the mills. Logging camps scattered across the drainage, each one employing thirty to a hundred men, cutting timber from November through March. The logs were hauled to the riverbanks on sleds, stacked in massive piles called rollways, and left to wait for spring.

When the ice went out, usually in late April, the rollways were released. The key logs holding the piles in place were pulled, and thousands of logs would thunder into the river, a controlled avalanche of timber. The current would catch them and push them downstream. The spring melt provided the water volume.

In a good year, the St. Croix would rise six or eight feet above its normal level, creating a surge of water that could move millions of logs downstream to the mills at Stillwater and the Boom Company sorting works just above the town. But the river was not a calm highway. It twisted, it narrowed, it split around islands.

There were rapids, rock outcrops, and sharp bends, and at every one of those features, logs could hang up. Small jams were expected. River drivers, the men who rode the logs, worked constantly to keep the drive moving, using peavies and can hooks to break up jams before they grew. A crew of twenty or thirty drivers could usually handle the normal friction of the drive.

But 1886 was not a normal year. The winter cut had been enormous. Over four hundred million board feet of timber had been sent to the riverbanks, more than twenty-five million individual logs. When the ice went out, all of that timber hit the river at once.

The St. Croix, even in flood, could not handle the volume. The logs packed tight, filling the channel from bank to bank, slowing the current, creating friction. And at Devil’s Elbow, a bend in the river where the channel narrowed to less than one hundred and fifty feet and the current pushed hard against the outside of the curve, the river finally choked.

On May 5th, 1886, the spring log drive came to a stop. Not a slowdown, a stop. A single log, a Norway pine about forty feet long, wedged between two rock outcrops on the bend. Behind it, more logs arrived, pushed by the current.

They piled against the first log. Then more arrived, and more. Within six hours, the jam had grown to several hundred thousand logs, a tangled mass of timber two hundred feet wide and starting to pile vertically. By the end of the first day, the jam was a quarter mile long.

By the end of the first week, it stretched for half a mile. By the time it stopped growing fifty-seven days later, the jam extended for over two miles upstream, containing an estimated one hundred and fifty million board feet of white pine. The jam started small. A few logs wedged against the rocks.

The drivers on site tried to break it immediately, prying at the key logs, trying to get the mass moving again. But more logs kept arriving, thousands per hour, pushed by the current and the pressure of millions of logs upstream. The jam grew faster than the crew could work. Within twenty-four hours, it was beyond the capacity of a small crew.

Inside seven days it had become something like a landmark of the landscape, a compacted wall of timber with logs heaped twenty and thirty feet deep in spots, reaching half a mile back up the river and continuing to expand. Above the blockage, the water was rising. Logs were pouring into the side streams, scattering into the woods, blanketing fields and roads. The whole log drive, the valley’s economic lifeblood, had ground to a halt.

The St. Croix Boom Company, which ran the drive and sorted the timber by ownership mark before it got to the mills, sprang into action at once. This was a threat to its very existence. Without logs arriving, the mills had nothing to saw.

And without the mills running, there was no money for wages or for honoring contracts. The whole regional economy stood on the edge of collapse. The Boom Company put out the word for men: river drivers, lumberjacks, anybody who knew how to work on logs. The rate was three dollars a day, twice the going wage, plus a five-dollar bonus for those willing to take on the most hazardous stretches.

Within days, more than two hundred men had gathered at the jam. The camp that rose near Devil’s Elbow was crude, even measured against logging camp standards. Tents and makeshift huts thrown together from scrap lumber. No sanitation at all.

Meals arrived by wagon, were cooked over open fires and handed out in shifts. Beans, pork, bread, coffee. The crews rotated, twelve hours on and twelve hours off, straight through the clock. Nobody got a day off.

The jam was not about to clear itself. And with every day it stood, the financial toll climbed. The Boom Company was covering not only the wages but also penalties owed to the mill owners for each day of delay. The mills, in turn, were contractually bound to supply lumber to their buyers.

When they failed to deliver, they owed damages. Those damages were accumulating quicker than the logs. The labor itself was a waking nightmare. The jam was no motionless heap.

It was a mass held under tension. The current kept shoving. Logs at the rear bore down on logs at the front. The sheer weight was staggering, millions of tons of timber squeezed into a span two miles long and at times forty feet tall.

The whole structure was on edge. Logs moved without pause. The one you stood on might turn over with no warning. A whole section could give way and lunge forward, men and all.

And beneath the surface logs ran water, cold and swift, threading through the gaps in the timber. Fall through the logs and you were in that water. The current would drag you under the jam, and you would drown, pinned beneath tons of wood, your body swept downstream days or weeks later when the jam at last gave way. The plan was to attack the jam from the front, to pick out the key logs bearing the mass and pull them, letting the pressure escape and the timber begin to move again.

The jam breakers, the most seasoned hands, would move toward the face of the jam, walking across the logs, testing with their peavies, hunting for the keystones. It came half from instinct, half from experience. You studied logs that appeared to carry more weight, logs that were bowed or squeezed, logs set at crucial angles. Once a key log was found, the crew would try to loosen it, hacking with axes, levering with peavies and can hooks.

At times they would run out a cable and bring a team of horses on the bank to haul. If the log broke free and that section began to shift, the men had to clear the logs at once. A releasing jam could pick up speed in seconds, logs rolling and grinding together, crushing whatever lay in the path. But the sheer scale of the jam made the old method all but unworkable.

There was no one key log. The mass was too big, too tangled. Taking it apart a log at a time would take months, perhaps years. So the Boom Company reached a decision that was equal parts brilliant and reckless.

They would bring in dynamite. Explosives had seen use in logging before, chiefly for clearing debris or breaking stubborn jams in tight canyons, but setting off dynamite on a jam this enormous, with men standing on the logs, was unheard of and wildly dangerous. The plan: bore holes into key logs, load them with dynamite, run a fuse, and blast the logs apart. The blast would break the log, take it out of the structure, and ideally free the pressure pinning the jam.

The drilling was all done by hand. A crew would single out a target log, typically one near the foot of the jam where it was wedged against the rocks. A driller would take a hand auger, a long steel bit turned by a crossbar, and bore into the log. The hole had to go deep, three or four feet into the wood, so the charge would land where it could do the most damage.

Boring one hole might take an hour. The work drained a man, the driller balanced on the log, steadying himself with one hand while turning the auger with the other. The log was wet and the surface slippery. If it turned while he was drilling, he was in the water.

With the hole finished, a blaster would load it with sticks of dynamite, set a fuse, and light it. Then everyone cleared the jam in a hurry. The blasts were both awe-inspiring and horrifying. A charge going off inside a log would rip the timber into pieces, some flung into the air, others driven into the logs around it.

The shock wave would pass through the jam, jarring other logs loose. Occasionally one explosion would set off a chain reaction, a section giving way and rushing downstream. Other times, the blast produced nothing you could see. The log would burst, a gap would open, and the jam would settle back, still holding.

There was no way to predict it. The blasters learned by trial and error, enlarging the charges, shifting them to new spots, searching for the mix that would break the jam without killing the crew. Danger was ever-present. Fuses could not be trusted.

A fuse meant to burn ninety seconds might go in sixty. If you were still on the jam when it fired, you were inside the blast. Flying wood, concussion, logs lurching in every direction. Men got hurt.

A blaster by the name of Michael Hanrahan was caught by an early explosion on May 18th. The blast flung him off the jam and into the river. He was dragged out alive downstream, but with a leg shattered and serious burns. He never worked again.

A second man, Joseph Leoo, met his end when a section of the jam gave way without warning following a blast. He was standing atop a log that shifted beneath him, and he dropped into the space between two layers of timber. The logs clamped shut around him, and though the crew worked to move the timber and drag him free, he was already gone. The work went on, day after day, week after week.

The jam was coming apart, but at a crawl. A small section would let go, a few thousand logs would drift downstream, and then everything would lock up again. The face would advance a hundred feet, then halt. Progress was counted in feet per day, not miles.

All the while, the expenses kept mounting. The Boom Company was hemorrhaging cash. Two hundred men at three dollars a day came to six hundred dollars daily. Dynamite did not come cheap, several dollars a pound, and they were going through hundreds of pounds every week.

Food, gear, transportation, every bit of it piled up. By the close of May, the company had laid out more than thirty thousand dollars, close to a million in today’s money, and the jam had not budged. Stillwater was starting to feel the squeeze. The sawmills had been idle since early May.

Thousands of mill hands were out of work. Those workers had families, and the families had to eat. The merchants who supplied the town were carrying them on credit, but that could only stretch so far. The town’s whole economy rested on lumber.

No lumber meant no money moving. Stillwater sat on the brink of financial ruin. The mayor and the town council called emergency sessions. There was talk of the state intervening, of appealing for federal help, but none of it went anywhere.

The burden landed on the Boom Company and the crew at Devil’s Elbow. Come mid-June, the approach changed. The blasters had come to see that hammering the jam from the front would never work quickly enough. The jam ran too deep.

The critical logs lay buried beneath layer upon layer of timber. So they resolved to come at it from the flanks. Crews were sent out onto the jam armed with crosscut saws. Their task was to saw through the logs along the jam’s edges, peeling the outer layers away from the main body.

Once severed, the outer logs would drift free and head downstream, shrinking the jam a little at a time. It was grueling, punishing labor. Cutting through a soaked pine log twelve inches across with a crosscut saw took ten or fifteen minutes. The men worked in pairs, one at either end, pulling in rhythm.

Let the saw do the work. But the logs were waterlogged, the saws clogged with sap, and the men were worn to the bone. Twelve-hour shifts, six days a week, with some putting in seven. There were no safety rules, no caps on hours.

You worked until you collapsed or until the job was finished. The sawing crews faced a danger all their own. As they cut through a log at the jam’s edge, the tension in the surrounding timber would shift. Now and then the log they were cutting would suddenly roll as the weight redistributed.

If you failed to release the saw in time, it would drag you along with it. One sawyer, a man by the name of Lars Anderson, was hauled into the jam when a log he was cutting rolled and carried the saw with it. He managed to let go, but he dropped into a gap between logs. The current seized him and pulled him under.

His body turned up three days later, two miles downstream, caught in a pile of debris. Lars Anderson, Patrick Quinn, Joseph Leoo, Michael Hanrahan. These were more than entries in a company ledger. They were men with families, men who rose each morning knowing the jam could kill them and went out to work regardless.

The sawing crews kept at it. The edges of the jam were pared away. The outer logs were cut loose and floated off downstream. The jam was getting smaller.

By the end of June, the front of the jam had pushed forward close to half a mile. The channel was beginning to open up. The dynamite crews kept blasting the core, trying to shatter the central mass. And then, on June 24th, after fifty days, something broke loose.

A massive blast near the base of the jam, the one heard in Stillwater fifteen miles off, shattered a cluster of key logs, and the pressure that had been building for almost two months was released all at once. The jam gave way. The breakup went on for three days, the timber surging downstream in waves, enormous pulses of logs, hundreds of thousands at a time. The river drivers worked desperately to keep the logs moving and stop new jams from forming below.

The logs arrived at the St. Croix Boom, the huge log sorting operation just above Stillwater, and the boom crews set to sorting the timber by ownership marks. The mills lit their boilers. Stillwater started to breathe again.

Yet the leftover jam at Devil’s Elbow still stood, a quarter mile of deep, snarled timber still choking a sizable stretch of the channel. The crews returned to work, more drilling, more blasting, more sawing, until the last section gave way in mid-July. The men who broke the jam became legends in the logging camps. Patrick Quinn, the man who was lost, was remembered in a ballad sung in the camps for years afterward.

The blasters and the sawyers, the men who had spent two months on the logs, were hailed as heroes when they returned to town. But most of them did not see it that way. It was a job, a dangerous, grueling job that paid well and almost killed them. When it was done, they collected their pay and moved on.

Some returned to the logging camps. Some picked up work in the mills. A handful quit the industry for good, deciding no amount of money was worth the risk. The physical trace of the jam is largely gone.

Devil’s Elbow remains, a bend in the St. Croix River that looks ordinary enough today. The rock outcrops were blasted away in the 1890s to ease navigation. The forests along the banks have grown back.

There is no marker, no monument to the jam or the men who broke it. But in the local historical societies, in the archives in Stillwater and St. Paul, the records survive: company ledgers listing the expenses, newspaper articles from the Stillwater Gazette describing the jam and the struggle to break it, photographs, a few grainy images showing the mass of logs and the tiny figures of men standing atop them, dwarfed by the timber. The legacy of the 1886 jam is written into the history of industrial logging in America.

Blasting jams with dynamite soon became the accepted method throughout the trade. In the years that followed, crews used explosives on jams throughout the northern logging country, in Maine, in Michigan, in the Pacific Northwest. The methods worked out at Devil’s Elbow were carried elsewhere and improved upon. The realization that a huge jam could be broken with sufficient explosives and sufficient men ready to set them off transformed the way the industry dealt with such calamities.

The St. Croix Boom Company put money into upgrades: blasting rock outcrops at the tightest bottlenecks, adding more booms to manage the flow, taking on extra river drivers and giving them improved tools. Jams still formed in the years that came after, but none matched the scale of 1886. The human toll was never fully tallied.

Six men lost their lives breaking the 1886 jam. How many more were hurt without any record being kept? How many walked away with damaged hearing from the blasts, with lung troubles from laboring in the wet and cold, with the mental scars of watching friends die? The records are silent.

The men kept it to themselves. You did the work. You lived or you didn’t, and then you carried on. That was how the logging camps operated, and it left no space for looking back or for sorrow.

The harm to the environment stayed close to home, yet it was harsh. The jam had held water back for miles, drowning forests and fields. Once the jam gave way, the rush of water and logs tore at the riverbanks, ripping out vegetation, loosening the banks, reshaping the river. The consequences could be seen for years.

The St. Croix, like every major logging river, was changed for good by decades of log drives. The drives scoured the river bottom, swept away snags and debris that gave fish shelter, and left sawdust and bark in amounts heavy enough to choke the streambed. By the time the log drives came to an end in the early 1900s, the river ecosystems had been harmed.

A century of recovery, dam removals and habitat restoration would be needed before the rivers came to look anything like their pre-logging condition. But none of that counted in 1886. What mattered was breaking the jam, getting the logs to the mills, keeping the economy running. The men who did that work, who spent fifty-seven days atop a mountain of timber with hand tools and explosives, putting their lives on the line daily, were the driving force behind that economy.

They never saw themselves as heroes. They saw themselves as workers doing a job, a harsh, perilous job that somebody had to do. And they did it. Walk along the St.

Croix today, and it is a peaceful river. Clear water, forests on either bank, kayakers and anglers. It is difficult to picture it jammed with logs, a two-mile-long wall of timber reaching upstream, men scrambling across the surface like insects, the noise of saws and blasts rebounding from the valley walls. Yet it all took place in the spring and summer of 1886.

The St. Croix was no longer a river. It was a battlefield. The men who fought there and broke the largest log jam in history left behind no monuments except the lumber that built a region and the certainty that it could be done.

The price was counted in lives, in dollars, in months of grueling labor. But the jam gave way, the logs went through, and the industry endured.

Related Posts

In 1900, guests at the Holloway Hotel in Newton County, Arkansas, kept vanishing from the same three rooms on the eastern wing. Seamstress Mary Carver left her sewing kit behind. Bible salesman…

The scratching started again around midnight, constant now, and Mary Ellis knew she would not sleep. She lay in her narrow room at the end of the third-floor corridor and listened to the sound working its way up through the building’s bones, a rhythmic scrape, scrape, scrape that came from somewhere below the floorboards. Mr. … Read more

In the 1980s, a high school rumor could travel through an entire building by lunchtime without a single text, group chat, or post. Someone whispered “after school, by the bleachers,” and the whole…

The whole school was already there by the time the circle closed. No one had sent a single message, no group chat existed, no one had posted anything anywhere, yet by lunchtime everyone knew the fight would happen after last bell, next to the bleachers. That was how news traveled then: whispered from locker to … Read more

In 1950, Roy Cox spent eight months building a tiny engine from scratch, holding tolerances of 25 millionths of an inch—any piston that deviated went straight in the trash. The Cox 049, a working…

The sound carried three backyards on a Saturday morning without even trying. Thin and slightly wrong, like something spinning faster than it had any right to. If you grew up anywhere in America between 1955 and 1985, you knew exactly what it was. It was the Cox 049, a working internal combustion engine machined to … Read more

In November 1909, authorities in Shannon County, Missouri, entered the Warren homestead and found the beds made, the pantry stocked, and a half-written letter on Thomas Warren’s desk. Thomas and…

Idaho Press-Tribune, October 17, 1907—that was the date stamped on the clipping, but the story itself was older, and stranger, and it began long before the newspaper ever touched it. It began, as so many things do, in the dark of a Missouri autumn. In the autumn of 1909, when the leaves turned copper and … Read more

In March 1923, Clarence Saunders cornered Wall Street itself. Working through a broker and southern banks, the Memphis grocer quietly bought nearly ev…

In the summer of 1923, on a hill at the eastern edge of Memphis, a half-finished mansion of pink Georgia marble rose against the sky. The man who ordered every stone placed there walked to the gate, handed the keys to his creditors, and never lived in the house. His name was Clarence Saunders, and … Read more

In 1848, Samuel Knap’s men dug 18 feet into a filled-in pit near Michigan’s Ontonagon River and struck a single mass of nearly pure copper—six tons of it. But the copper wasn’t lying on the floor….

The copper tool came out of a mining pit in Michigan and went to a laboratory. The lab returned a date of 8,500 years old. Hold that number, because it breaks something. That tool was already ancient when the first pyramid in Egypt was still only an idea in someone’s head. It was already old … Read more

Leave a Reply

Your email address will not be published. Required fields are marked *