In 1880, a Cleveland banker with zero experience running heavy machinery paid $17,000 for an idle Ohio foundry. Daniel Eells steered it toward steam shovels—and by 1904, his firm, Bucyrus, was supplying…

On May 22, 1969, the biggest machine ever to move on land rolled out of a factory in South Milwaukee, Wisconsin. It tipped the scales at 13,500 short tons, rose 222 feet into the air, and measured 487 feet from end to end. Its bucket scooped 220 cubic yards—room enough for two Greyhound buses side by side—and it pulled 52,500 horsepower from 28 DC motors, drawing the same electrical current as a town of 27,500 residents. Just putting it together took 200,000 man-hours.

Thumbnail

People called it Big Muskie, and it was a walking dragline—the only one ever constructed with hydraulic walking cylinders in place of the usual mechanical shoes. For 22 years it ran nonstop, shifting over 600 million cubic yards of earth, until the economics under it gave way, dragging down the company that had built it and wiping out a name that had helped shape the modern world. That name was Bucyrus-Erie. For 131 years, whenever something enormous had to be dug, moved, or torn out of the ground, this was the outfit people called.

They cut the Panama Canal, they equipped two world wars, and they built the biggest machines that have ever stood on dry land. Yet today, every remnant of the Bucyrus name has been covered in yellow paint. The tale starts with a banker who wouldn’t have known a steam shovel if it hit him. In 1880, a Cleveland financier named Daniel Parmelee Eells stepped into a transaction that would transform the construction business for more than a century.

Eells served as president of the Commercial National Bank of Cleveland and held seats on the boards of 32 companies. He was a dealmaker, not an engineer. When a dormant foundry in the little town of Bucyrus, Ohio went on the market, he snapped it up for $17,000. The foundry occupied a mere acre and a half, and its earliest products weren’t shovels at all.

The Bucyrus Foundry and Manufacturing Company got its start turning out railroad parts—hand cars, locomotive drive wheels, axles, and track switches. It was steady, unglamorous work for a small Ohio shop. But in 1882, orders arrived from the Northern Pacific and Ohio Central Railroads for something else entirely. They wanted steam shovels.

Eells redirected his little foundry into the steam shovel trade. The bet paid off fast. From 1882 through 1885, Bucyrus sold ten shovels and cleared an $80,000 profit. By 1888, that figure had risen to 49 shovels.

In 1883, their consolidated steam shovel and derrick captured first prize at the National Exposition of Railway Appliances in Chicago. A small foundry in rural Ohio was suddenly going head-to-head with established manufacturers on a national stage. Then came a choice that nearly finished the company before it ever got to Panama. In October of 1891, Bucyrus moved its whole operation to South Milwaukee, Wisconsin.

On paper the deal looked tempting: $50,000 in cash plus $45,000 in land, eight acres sitting right beside the Chicago and Northwestern Railroad and a Lake Michigan dock. But the relocation turned into a disaster. Only about ten percent of the Ohio workforce made the move. The rest had to be replaced by Polish, Armenian, German, and Bohemian immigrants who had never built heavy equipment before.

By 1895, the company was for all practical purposes bankrupt. Daniel Eells’s own son, Howard, had to be appointed receiver just to keep the doors open. They reorganized as the Bucyrus Company in 1896 and didn’t fully climb out of insolvency until 1897. Yet the company didn’t merely survive—it came back with a vengeance.

By 1899, Bucyrus had turned out a 95-ton steam shovel with a five-cubic-yard dipper that the trade press dubbed the largest ever built. Steam shovels had grown from a side product into 80 percent of the company’s total revenue. And then, in 1904, the United States government came knocking with the biggest construction project in human history: the Panama Canal. Conditions on the ground at the Culebra Cut were brutal, mechanical, and deeply dangerous.

Bucyrus landed the contract to supply most of the steam shovels. Seventy-seven of the 102 shovels that carved through the Continental Divide bore the Bucyrus name. Marion Power Shovel, the rival from just 15 miles away in Ohio, supplied 24. Each Bucyrus shovel ran with a crew of four—an engineer, two firemen, and a craneman—plus six ground workers.

Operators made between $210 and $240 a month, with free housing and medical care. In March of 1910, one Bucyrus shovel set a canal record by moving 70,000 cubic yards of earth in a mere 26 days. When the Cucaracha slide dumped 500,000 cubic yards of mud into the cut in 1907, it was Bucyrus machines that dug it back out. But the canal was more than an engineering triumph.

It was a graveyard. In December of 1908, a dynamite blast killed 23 workers and injured 49 more. The official death toll for the whole American construction era was 5,609. Combined French and American estimates put the true number somewhere between 25,000 and 30,000.

In November of 1906, President Theodore Roosevelt went to Panama and climbed into the cab of a Bucyrus steam shovel for what became one of the most celebrated photographs of the entire project. For Bucyrus, it was the ultimate endorsement. By 1911, the company’s net worth had reached $2.3 million.

Corporate profits from the canal years between 1905 and 1907 alone came to $500,000. The idle foundry Daniel Eells had bought for $17,000 was now the dominant force in heavy earth-moving equipment on the planet. The Panama Canal made Bucyrus famous, but the decades that followed turned them into an empire. In 1927, the company merged with the Erie Steam Shovel Company of Erie, Pennsylvania.

Erie had built the first lightweight power shovels during World War I—the 20-ton Type B in 1915 and the 13-ton Type A in 1916. The merged company became Bucyrus-Erie, and the industry nicknamed them “the longest line” because their catalog spanned everything from small utility shovels to the largest mining machines on Earth. The real engineering leap had begun earlier. In 1912, Bucyrus pioneered electric power for excavators using a Ward Leonard direct current control system.

In 1913, a Norwegian-born engineer named Oscar Martinson filed a patent for something that would define the company for the next 80 years. He called it the Martinson tractor. Today we know it as the walking dragline mechanism. It used a tub base with eccentric cam-driven walking shoes that let machines weighing thousands of tons literally walk across the ground at about 12 feet per step.

Bucyrus secured the rights to this technology in 1931 when it bought the Monighan Manufacturing Company of Chicago. From then on, they owned the future of large-scale surface mining. Between the wars, Bucyrus-Erie assembled an unmatched engineering bench. The 50-B, introduced in 1923, became the first heavy-duty shovel with full 360-degree rotation.

Five hundred thirty-four units rolled out of South Milwaukee between 1923 and 1939. Then came the 10-B in 1934, which became the company’s mass-market workhorse. Over the next 25 years, Bucyrus-Erie built 10,053 units that shipped to construction sites and mines across the globe. No other model in the company’s history came close to those production numbers.

When the world plunged into war twice, the company followed right along. During World War I, the South Milwaukee plant turned out 150,000 eight-inch artillery shells and 100 recoil slides. But the crucial fact that few ever mention is what took place in 1915, a full two years before America formally joined the war. Bucyrus co-founded the Mississippi Valley Products Company for the express purpose of making shell blanks for the British military.

They were secretly supplying arms to the Allies while the United States remained officially neutral. By 1918, yearly sales had climbed to $6.6 million. World War II would prove even larger.

The South Milwaukee works produced 240-mm howitzer barrels, carriages, mounts, and transport vehicles. From 1940 to 1944, excavator shipments by themselves topped $44 million. Two-thirds of the company’s total output went straight to the war effort. At the Glassport Foundry in Pennsylvania, the workforce swelled from fewer than 50 people to 3,200, pouring armor steel, casting tank turrets, and forging ship anchors.

By 1945, Bucyrus had delivered 3,000 units to the military and its allies. The oddest item of war production originated not in South Milwaukee but in Lincoln, England. In 1930, Bucyrus formed a joint venture with the British firm Ruston and Hornsby, named Ruston-Bucyrus. In 1939, Winston Churchill personally tasked that joint venture with building one of the most bizarre weapons of the entire conflict.

Churchill envisioned a machine that could carve a trench through the German Siegfried Line defenses. He dubbed the project Cultivator Number Six, also known by the code name White Rabbit Number Six. The prototype was nicknamed Nelly. The initial funding amounted to one million pounds sterling.

French soldiers were dispatched to gather soil samples along the Siegfried Line so the engineers in Lincoln could test their designs. The Germans spotted the unusual patrol activity, though they never worked out what the French were after. The machine itself measured 77 feet long, seven feet wide, and eight feet tall, and weighed 130 tons. It could cut a trench seven and a half feet wide and five feet deep while advancing at about two-thirds of a mile per hour.

The original design specified Rolls-Royce Merlin engines—the very engines that powered the Spitfire. When Merlins became too precious for the air war, the engineers reworked the machine with twin 600-horsepower Davey Paxman diesels instead. A scale model was built in secret by the Bassett-Lowke Model Company in the cellar of a hotel in Bath. Churchill ordered 200 infantry versions and 40 wider officer versions capable of accommodating tanks, but only around nine were ever completed before the project was abandoned.

Churchill referred to the machine as “My Mole” and later remarked that he remained unrepentant about the entire endeavor. After the wars, Bucyrus-Erie entered what can only be described as the age of the super strippers. These were the largest land machines ever built, designed specifically to peel away hundreds of feet of overburden to reach the coal seams below. The 3850-B, nicknamed Big Hog, arrived in 1962 at Peabody Coal’s Sinclair Mine in Kentucky.

It weighed 18 million pounds and carried a 115-cubic-yard bucket on a 215-foot boom. Only two were ever constructed. In 1960, a precision scale model of the 3850-W was presented to President Dwight Eisenhower. That model was later donated to the Smithsonian Institution.

The 1950-B, Silver Spade, came next in 1965. It weighed 14 million pounds, stood 220 feet tall, and generated 13,500 peak horsepower from 14 AC motors fed by a 7,200-volt trailing cable. Its bucket held 105 cubic yards and could reach 390 feet. The entire machine was operated using just two hand levers and two foot pedals.

The Silver Spade operated for 41 straight years, from 1965 to 2006, and moved 607 million, 226,370 cubic yards of earth—roughly twice the volume of the entire Panama Canal. When it was finally dismantled in February 2007, it was the longest-serving super stripper on record. In 1967, the Gem of Egypt joined the fleet with a 130-cubic-yard bucket on a shorter boom designed for a different mine geometry. Twenty-five thousand people attended its dedication ceremony at the Egypt Valley mine site.

When 25,000 people turn out to watch a shovel begin digging, the machines have become something more than industrial equipment. They had become spectacles. And then, in 1969, came Big Muskie, the machine that propelled Bucyrus-Erie into territory no engineering company had ever reached. Its boom was actually two 2570-model booms joined together.

The wire ropes were five inches thick, the largest ever manufactured at the time. Individual chain links weighed roughly 1,000 pounds apiece. It ran 24 hours a day, seven days a week, 364 days a year, and moved 608 million cubic yards of earth. But the empire was standing on ground that was about to shift.

In 1974, Bucyrus-Erie appeared invincible. The company had a $636 million order backlog—roughly a 15-year supply of work. They doubled their factory space from 2.3 million to 4.

6 million square feet and expanded the workforce by 80 percent. By 1979, shipments reached $550 million. Revenue had grown sevenfold since 1962, and profit had risen by 2,500 percent. The company was the undisputed king of mining equipment.

Then the world changed. Oil prices collapsed in the early 1980s, and with them went the economics of coal mining that had justified building machines like Big Muskie and the Silver Spade. Environmental regulations tightened across the board. The Surface Mining Control and Reclamation Act had already imposed strict requirements on strip mine operators, and public opposition to mountaintop removal in Appalachia was growing louder every year.

The market for giant stripping shovels and draglines was shrinking rapidly, and nobody was ordering new ones. In 1982, the company made what many regard as its first fatal mistake. They acquired Western Gear Corporation, a California aerospace firm with no connection to mining or construction. Internal documents later described the purchase as an insupportable drain on resources.

In 1984, management formed a holding company called Becor Western in a failed attempt at a takeover defense. By 1987, outside consultants delivered a blunt verdict: profitability was unlikely to improve until 1990, if ever. That assessment turned out to be wildly optimistic. Then Wall Street arrived.

In 1988, Goldman Sachs executed a leveraged buyout that saddled the company with $100 million in debt against just $16 million in equity. The annual debt service alone was $21 million. The company had to generate $21 million in cash every single year just to cover the interest before it could spend a dollar on operations, maintenance, or new equipment. For a company already grappling with declining orders, it was a financial death sentence written on Wall Street letterhead.

Meanwhile, in eastern Ohio, the Clean Air Act of 1990 was rendering the high-sulfur coal that Big Muskie had been uncovering for two decades essentially unmarketable. Power plants across the country were switching to low-sulfur Western coal from Wyoming and Montana. The coal that Big Muskie stripped from the earth was suddenly worth less than the electricity it cost to run the machine. The dragline that consumed the power of an entire town had no economic reason to exist.

Big Muskie was taken out of service in January 1991, after running nonstop for 22 years. The biggest mobile land machine ever constructed simply halted in place. From 1990 through 1993, Bucyrus-Erie reported net losses totaling $108 million. Revenue tumbled to $198 million.

On February 18, 1994, the firm sought Chapter 11 bankruptcy protection. Lenders agreed to take 87 percent of the company’s stock in return for writing off $135 million of debt. Ten months later, on December 14, the company came out of bankruptcy, but only as a shell of its former self. The workforce had been slashed, the product range was thin, and the Bucyrus name bore the mark of a leveraged buyout that should never have occurred.

Then came a twist that caught everyone off guard. In January 2000, a man by the name of Tim Sullivan came back through the door. Sullivan had started at Bucyrus in 1976, departed in 1998, and returned to find the company bleeding $33 million a year on revenue of $280 million, with only 1,700 employees remaining. There were no acquisitions, no growth plan, and no faith from the market.

Sullivan grasped that the mining equipment business had not vanished. It had consolidated. The real question was whether Bucyrus would be the one doing the consolidating or the one being consumed. His strategy began with taking out the company’s oldest rival.

Since 1884, the Marion Power Shovel Company had run its operations a mere 15 miles from the original Bucyrus Foundry in Ohio. For 113 years, the two firms had fought over every major contract on the planet. When Bucyrus built the Silver Spade in 1965, Marion answered that same year with the 6360, nicknamed the Captain—15,000 tons, a 180-cubic-yard dipper, a 215-foot boom, and a price tag of $25 million. When NASA required crawler transporters to haul rockets at Cape Canaveral in the early 1960s, Marion took the contract and built two transporters at $14 million apiece.

Those crawlers are still hauling rockets today, six decades on. The rivalry ran so deep that the two companies could agree on precisely one thing in more than a century: a single patent cross-license, in which Marion licensed its knee-action crowd mechanism to Bucyrus and Bucyrus licensed its cable crowd mechanism to Marion. That was the only cooperative arrangement between the rivals in 113 years. In 1997, three years before Sullivan came back, Bucyrus bought Marion for $40.

1 million. The Marion factory in Ohio was shut down. With Marion came the NASA crawler transporter contract and every other Marion customer on the books. Sullivan built on that base and kept going.

In 2007, he purchased the German mining equipment maker DBT for $710 million, giving Bucyrus a foothold in underground mining and European markets. In 2010, he bought Terex Mining for $1. 3 billion, adding trucks and hydraulic shovels to the lineup. Revenue climbed from $280 million to $3.

65 billion—a 14-fold increase. Earnings before interest, taxes, depreciation, and amortization rose from essentially nothing to $850 million. The workforce expanded from 1,700 to 11,800 employees. Fortune magazine ranked Bucyrus the ninth fastest-growing company in America.

The company that had been bankrupt just six years before Sullivan arrived was now one of the fastest-expanding industrial firms in the country. And that is precisely when Caterpillar came calling. On November 15, 2010, Caterpillar announced its plan to acquire Bucyrus International. The timing was no accident.

The global mining boom was in full swing, commodity prices were climbing fast, and Caterpillar wanted to dominate the mining equipment market. The opening offer was $68 per share. The Bucyrus board turned it down. A bidding war broke out.

The final price landed at $92 per share, a 32 percent premium over the initial bid. The total deal, including net debt, came to roughly $8. 6 billion—by a wide margin the largest acquisition in Caterpillar’s history. The deal closed on July 8, 2011, after winning clearance from both the Department of Justice and Chinese regulators.

Tim Sullivan walked away with approximately $48. 5 million. Investors who had bought shares at the 2004 initial public offering price of $18 per share saw a 411 percent return in seven years. Then the erasure started.

Caterpillar painted every Bucyrus machine yellow. They swapped the Bucyrus model numbers for Cat designations. The Bucyrus name was stripped from every product, every document, every piece of marketing. At the South Milwaukee factory, the one that had been running since April of 1893, Caterpillar laid off 300 workers in March of 2012, roughly 40 percent of the hourly workforce.

By 2015, about 450 jobs were gone—55 percent of the total. Engineering was moved to Tucson, Arizona. Production stopped altogether in 2016. The factory that had built Panama Canal shovels, World War artillery shells, Churchill’s secret weapon, and the largest mobile land machine in human history went silent after 123 continuous years of operation.

So where are the giants today? Big Muskie was scrapped in 1999. The machine that cost $25 million in 1969—roughly $219 million in today’s dollars—was cut apart and sold as scrap metal for $700,000. The bucket survived.

It sits at Miners Memorial Park in McConnelsville, Ohio, where visitors can walk up and climb inside. Big Hog met a different fate. In 1986, the machine was buried in its own last mining pit. It is still down there.

Big Brutus fared better. The machine stands preserved in West Mineral, Kansas, where it was added to the National Register of Historic Places in 2018. About 22,000 visitors come to see it every year, making it the largest electric shovel still in existence. The land where Big Muskie once walked has been turned into something entirely different.

The Wilds, a 10,000-acre wildlife conservation park, opened in 1994 on the former strip mine in eastern Ohio. Endangered species now roam grasslands that were reclaimed from the scarred earth. Across the world, Bucyrus machines are still standing, and in some cases still working. In Yorkshire, England, a BE 1150-RB walking dragline from 1946 sits preserved at the St.

Aidan’s Nature Reserve. In Alberta, Canada, a 1917 Class 24 dragline at the Reynolds-Alberta Museum is believed to be the oldest surviving dragline in existence. At the Beamish Museum in England, a Ruston-Bucyrus 25-RB from 1931—one of the machines from that same joint venture that built Churchill’s cultivator—is on permanent display. A Bucyrus dragline called Ursa Major, a 2570-WS model, is still digging at the Black Thunder Coal Mine in Wyoming.

It is the largest operational dragline in North America. More than 70 Bucyrus-built draglines are still working across the coal mines of Australia. And the Caterpillar 7495 electric rope shovel, with roughly 237 units built, is the direct engineering descendant of the machines that came out of South Milwaukee. If you see a Cat 7495 loading haul trucks at a copper mine in Chile or an iron ore pit in Western Australia, you are looking at Bucyrus DNA under a coat of Caterpillar yellow.

In August of 2021, a museum opened in South Milwaukee dedicated to the company that ran that town for over a century. It holds 20,000 artifacts from the Bucyrus era. The factory next door sits empty. Daniel Parmelee Eells paid $17,000 for an idle foundry in 1880.

A hundred and thirty-one years on, Caterpillar shelled out $8.6 billion for what that foundry grew into. And today Bucyrus-Erie—the firm that dug the canal, armed the wars, built Churchill’s mole, and shifted more dirt than any enterprise in history—amounts to nothing more than an entry on a Caterpillar balance sheet.

Related Posts

In 1900, guests at the Holloway Hotel in Newton County, Arkansas, kept vanishing from the same three rooms on the eastern wing. Seamstress Mary Carver left her sewing kit behind. Bible salesman…

The scratching started again around midnight, constant now, and Mary Ellis knew she would not sleep. She lay in her narrow room at the end of the third-floor corridor and listened to the sound working its way up through the building’s bones, a rhythmic scrape, scrape, scrape that came from somewhere below the floorboards. Mr. … Read more

In the 1980s, a high school rumor could travel through an entire building by lunchtime without a single text, group chat, or post. Someone whispered “after school, by the bleachers,” and the whole…

The whole school was already there by the time the circle closed. No one had sent a single message, no group chat existed, no one had posted anything anywhere, yet by lunchtime everyone knew the fight would happen after last bell, next to the bleachers. That was how news traveled then: whispered from locker to … Read more

In 1950, Roy Cox spent eight months building a tiny engine from scratch, holding tolerances of 25 millionths of an inch—any piston that deviated went straight in the trash. The Cox 049, a working…

The sound carried three backyards on a Saturday morning without even trying. Thin and slightly wrong, like something spinning faster than it had any right to. If you grew up anywhere in America between 1955 and 1985, you knew exactly what it was. It was the Cox 049, a working internal combustion engine machined to … Read more

In November 1909, authorities in Shannon County, Missouri, entered the Warren homestead and found the beds made, the pantry stocked, and a half-written letter on Thomas Warren’s desk. Thomas and…

Idaho Press-Tribune, October 17, 1907—that was the date stamped on the clipping, but the story itself was older, and stranger, and it began long before the newspaper ever touched it. It began, as so many things do, in the dark of a Missouri autumn. In the autumn of 1909, when the leaves turned copper and … Read more

In March 1923, Clarence Saunders cornered Wall Street itself. Working through a broker and southern banks, the Memphis grocer quietly bought nearly ev…

In the summer of 1923, on a hill at the eastern edge of Memphis, a half-finished mansion of pink Georgia marble rose against the sky. The man who ordered every stone placed there walked to the gate, handed the keys to his creditors, and never lived in the house. His name was Clarence Saunders, and … Read more

In 1848, Samuel Knap’s men dug 18 feet into a filled-in pit near Michigan’s Ontonagon River and struck a single mass of nearly pure copper—six tons of it. But the copper wasn’t lying on the floor….

The copper tool came out of a mining pit in Michigan and went to a laboratory. The lab returned a date of 8,500 years old. Hold that number, because it breaks something. That tool was already ancient when the first pyramid in Egypt was still only an idea in someone’s head. It was already old … Read more

Leave a Reply

Your email address will not be published. Required fields are marked *