In 1968, engineers laid a hot oil pipeline into frozen Alaskan silt, and within years the ground beneath it thawed, sagged, and ruptured. So they raised 420 miles of it into the air on stilts…

At 2:38 on the afternoon of July 8th, 1977, pump station 8 blew apart. The federal accident report attributes the blast to oil spraying from a defective strainer during startup, where it met an ignition source. The pump building then caught fire. One worker lost his life.

Thumbnail

Five others were injured. Alyeska’s records list the oil lost that day at 300 barrels, and the pump building was obliterated. The line was filled with oil from Prudhoe almost all the way to Fairbanks. Every hour it sat motionless, the oil cooled, and one of the stations meant to push it along was now a charred ruin.

Pump station 8 would not operate again until 5:11 on the morning of March 7th, 1978—eight months later. The line continued without it. This was the seventh and final blow the north struck before a single drop of Alaska’s oil could reach the sea. In 1968, America had discovered a massive oil field at Prudhoe Bay, and the only way to extract that oil was an 800-mile pipe carrying hot oil across terrain that turns to mud the instant you warm it.

The steel pipe, four feet in diameter, snakes across the tundra on stilts, spanning frozen rivers and ascending toward white mountains, while a crawler tractor lowers the next section into position and men in parkas stand alongside, dwarfed by the snow. On a summer night in 1977, the first oil reached the sea, but Alyeska, the company that built the line, counts 32 workers who died bringing it to completion, and 20 days before that night, one of its own pump stations exploded. Two people thread through this story. One is Frank Moolin, the construction boss who vowed the entire line would be buried by a single date in 1976.

The other is Diane Shanker, a 21-year-old college graduate in Fairbanks who persuaded her way onto an all-male welding crew and spent her first days on her knees beneath the pipe. Before the oil could flow, the north had to be defeated seven times. First, a road that melted, then a ship trapped in the ice, then the frozen ground itself, then a river nearly half a mile wide, a mountain face steeper than a church roof, a pass that buries everything in avalanches, and finally, the day they turned the oil on. The first attempt came before anyone had even designed a pipeline, in November 1968.

The oil companies required drilling rigs, fuel, and camp buildings on the North Slope, and the North Slope had no road. So Alaska’s governor, Walter Hickel, directed the state highway department to carve a winter road north from the end of the gravel near Livengood—roughly 400 miles—across the Brooks Range to Prudhoe Bay. The crews set out with bulldozers in the darkness of an Arctic winter. They did what road builders had always done.

They scraped the ground down to something firm and drove over it. By March of 1969, the road was complete. Trucks could use it. On paper, the state had just opened the Arctic.

Then spring arrived, and the road vanished. Not all at once. It sank. What the bulldozers had scraped away was the thin layer of moss and grass covering the tundra, and that layer turned out to be the only thing keeping the ground beneath it frozen.

Beneath it was soil riddled with ice. With the layer gone, the summer sun beat straight into it, the ice melted, and the road became a long trench filled with water. People began calling it the Hickel Canal. That is the paradox the rest of this story hinges on.

The tundra doesn’t support you because it’s hard. It supports you because it’s cold, and the cold persists only as long as you don’t disturb the surface. The more aggressively you dig for a solid foundation, the faster you destroy the foundation you already had. The road cost the state approximately $700,000.

A transportation study written years later tallied what it moved that first winter: 8 tons, less than three loads on a cargo plane. An entire winter of bulldozers in the dark, 400 miles of road through the Brooks Range, and the same freight could have gone north on three flights. The north’s first lesson cost $700,000 in a single spring, and the next attempt didn’t even try the land. It went by sea.

On August 24th, 1969, a tanker named the Manhattan departed Chester, Pennsylvania, bound for the top of the world. She was the largest ship under the American flag at the time, roughly the length of the Empire State Building laid on its side. The Humble Oil Company had equipped her with an ice-breaking bow. The plan was simple to state.

If a tanker could force its way through the Northwest Passage, the oil could leave Prudhoe Bay by ship, and no one would need to cross Alaska at all. On board was a 31-year-old from the University of Alaska’s Geophysical Institute named Merritt Helfferich, there to study the ice the ship was breaking. The ice fought back. In McClure Strait, the floes packed so tightly that the ship had to turn around and find another channel through Prince of Wales Strait.

Sea ice wrecked her speed instruments. An iceberg punched through a section of her hull. She required Canadian and American icebreakers to keep moving. On September 14th, 1969, the Manhattan reached Prudhoe Bay nonetheless.

She had done it. And that is precisely what killed the idea. She made it back to New York on November 12th. Humble Oil examined what it had taken to get one ship through once in late summer and concluded the cheaper answer was a pipe.

Helfferich recalled it years later with one plain line about the cost of the pipe they chose instead. “800 miles of it,” he said, “was not cheap.”

The pipe was already on its way. On September 13th, 1969, the day before the Manhattan reached Prudhoe, about a hundred million dollars’ worth of 48-inch steel pipe from Japan was unloaded at the port of Valdez.

It would sit there for years because the next problem was the ground the pipe was meant to lie in. The oil emerges from the Prudhoe wells at around 120 degrees, and it must stay warm because cold crude thickens and stalls. So you have a river of hot oil four feet wide and you need to carry it 800 miles. Now consider the ground.

Alyeska’s own fact book states that about three-quarters of the route crosses permafrost, ground that has remained below freezing for at least two years, and it isn’t a thin crust. Alyeska lists the depth of the frozen ground along the route as anywhere from a few inches to about 2,230 feet. Some of it is gravel and bedrock, and you can warm that and it barely reacts. But much of it is fine silt holding 20 to 50 percent visible ice.

The fact book describes what happens when that sort of ground thaws. It loses its strength. It settles, and the soil can hold so much water that it actually flows. Picture a hot frying pan set down on a frozen pond.

For a moment the pan is fine. Then it begins to sink, and the water it creates is what pulls it under. That is exactly what the first pipeline plan proposed to do, across 800 miles. The original concept was to bury almost the entire line in a ditch, the way pipelines were buried everywhere else.

Hot pipe, frozen silt, a ditch. Within a few years the ground around it would thaw. The pipe would sag, and somewhere out in the middle of nowhere it would bend and snap. Engineers pulled soil cores along the whole route and found the ice in them, and the burial plan was dead before a single section went into the ground.

While the design was being redrawn, the lawyers took charge. In April of 1970 a federal judge in Washington halted the project with an injunction. It remained halted for more than three years, until the Senate deadlocked 49 to 49 in July of 1973 and Vice President Spiro Agnew cast the tie-breaking vote, and President Nixon signed the authorization that November, weeks into the Arab oil embargo. Throughout that time, the Japanese pipe sat in Valdez in the rain.

And far more of it was still on the way. Across the entire job, Alyeska counts over 100,000 lengths of pipe and roughly 550,000 tons of steel shipped from Japan. Those years were not idle on the ground, though. Survey crews and camp crews were already living along the route, and the north was teaching them what winter meant up there.

January 23rd, 1971. At a pipeline camp named Prospect Creek, just north of the Arctic Circle and about 160 miles north of Fairbanks, the weather observer read his thermometer and recorded 80 degrees below zero. The warmest it reached that entire day was 64 below. It remains the coldest temperature ever officially recorded in the United States, and it was logged by the very people preparing to build this pipe.

That is the other half of the problem. The ground cannot be warmed, and the air can kill you. At 80 below, exposed skin freezes in minutes. Steel turns brittle.

Diesel thickens to jelly in the fuel lines unless it is treated. Alyeska lists the temperature range along the route as 80 below to 95 above, and every machine and every weld on the line would have to survive both extremes. Other people walked the route in those years as well, and they were not searching for oil. Before the pipe could go in, Alyeska paid the University of Alaska and Alaska Methodist University to survey the entire line for archaeology.

Crews walked the corridor from the Arctic Ocean to the sea. The survey cost about 2.2 million dollars and ended in the excavation of roughly 330 sites, places where people had camped and hunted along that same ground long before anyone had heard of Prudhoe Bay. The oil itself had been a long time coming.

Alyeska’s fact book says exploratory drilling on the North Slope continued for more than 20 years. Well after well came up dry, and company after company gave up and left before the discovery well at Prudhoe was drilled in 1967, and a second well the following year proved how large the field really was. After 20 years of dry holes, nobody was going to leave that oil in the ground over a little mud. The only question was how.

Meanwhile, the engineers returned to the frying pan on the pond. If you cannot put a hot pipe into the frozen silt, the only alternative is to keep it off the silt altogether. So in the stretches where the ground was full of ice, they decided to lift the pipe into the air and set it on legs. Gravel and bedrock could still take a buried pipe.

The ice-rich ground would get stilts. When the final tally was made, about 420 miles of the line would run above ground. About 376 miles would be buried the ordinary way, and about 4 miles would be buried in a special way. But stilts bring their own problem, and it is a sneaky one.

A steel leg driven into frozen ground is a straight path for heat. Summer sun warms the steel, the steel warms the ground around it, and the ice around the leg begins to melt. Then winter arrives, the top layer of soil freezes again and expands, and it grips the leg and shoves it upward. Alyeska calls that frost jacking.

Do that year after year, and a leg works its way up out of the ground like a fence post in a farmer’s field. Anyone who has set posts in cold country knows the sight. A fence line where every spring the posts sit a little higher than they did the fall before. Now imagine that fence post is holding up a pipe full of hot oil.

If one leg rises and the next one does not, the pipe between them bends. Do that across hundreds of miles for decades, and the pipe tears itself apart. So the legs had to do something nobody had ever asked a fence post to do. They had to keep the ground cold on their own.

The answer was a tube inside the leg. Two of them, in fact, each about 2 inches wide on every leg that needed it, each sealed and charged with ammonia under pressure, running from deep in the ground up to a set of aluminum fins at the top of the leg. Here is how it works, and it sounds like it should not. In winter, the ground down where the tube ends is warmer than the Arctic air up top.

The ammonia at the bottom absorbs that heat and boils. The vapor climbs to the fins. The fins are sitting in air at 40 below, so the vapor releases the heat and turns back into liquid, and the liquid runs back down the tube to do it again. All winter long, every leg draws heat out of the ground and flings it into the sky.

And in summer, when the air is warmer than the ground, it stops. The liquid sits at the bottom. Heat cannot travel back down. It is the same thing you see on a cold kitchen window when a pot is boiling on the stove.

The steam carries the heat to the glass, gives it up, and runs down as water. Only here the window is the Arctic sky and the pot is the frozen ground. The ground beneath each leg grows colder every winter than it ever would on its own, and the warm months cannot undo it. That was the design.

Whether 800 miles of it could truly be installed by crews laboring at 60 below was another matter entirely, and no one had settled it yet. So when the work at last began, the engineers possessed a design, a permit, and a nation awaiting its gas lines. What they lacked was any means of getting even one truck to the northern terminus. The solution would have to be a road, and after the Hickel Canal, everyone understood what an Arctic road might become.

On April 29th, 1974, crews began the haul road running north from the Yukon River to Prudhoe Bay, 358 miles. They had until summer’s end. The first segment already stood. A road from Livengood up to the Yukon had been carved through in the winter of 1969, the final project of the Hickel years.

Everything north of the river was new, and every worker on the job felt the question looming over it. Would this road sink as well? This time they did the reverse of what the bulldozers had done in 68. They did not scrape the tundra.

They covered it instead. The road was raised on a thick bed of gravel spread over the living moss. The gravel thus became a fresh blanket, and the frozen earth below never saw the sun. The fact book lists the gravel for the haul road at 32 million cubic yards.

Each of those yards had to be dug from a gravel pit, loaded, hauled, and spread over terrain that had no road to haul it on, which is why so much of the initial equipment and fuel arrived by air on what construction records tally as roughly 170,000 flights. Alyeska puts the road work at 3 million hours under the long summer light. At that summer’s peak, some 3,400 people were laboring on the road. The crews built 20 permanent bridges.

The road would eventually bear the name of James Dalton, an Alaska-born mining engineer who had overseen construction of the distant early warning line’s radar stations across the Arctic. On September 29th, 1974, 154 days after they began, the haul road was complete. It was the first highway in America to cross the Arctic Circle. But a road beginning at the Yukon River is useful only if you can get across the Yukon River.

At the crossing, the Yukon is a large brown river running fast, and the bridge planned for it would span 2,295 feet. Until it was finished, everything bound north had to cross by ferry in summer or over a road of ice in winter. Work on it had begun in May of 1974. To set a bridge pier in a river like that, you build a cofferdam.

Picture forcing a bottomless steel can down into the riverbed and pumping the water out so men can work dry on the river bottom while the current rushes past the walls. The cofferdams for the Yukon piers measured about 54 feet wide and 37 feet deep. In August of 1974, the cofferdam at Pier 4 gave way at its base while crews were setting the pier. They hauled the entire structure out of the river and began again.

The ground beneath Pier 4 was the problem. One corner of it was unstable, so the engineers redesigned the footing and built a larger cofferdam to reach it. Through the winter, freight crossed the Yukon the old way, on a road of ice laid over the frozen river. The bridge they ultimately completed has an odd habit worth noting.

It changes length with the seasons. Between winter’s cold and summer’s warmth, the steel deck expands and contracts by nearly 2 feet. Remember that number, because the pipe has the same issue. 800 miles long, yet the pipe still wasn’t in the ground anywhere.

March 27th, 1975. At the Tonsina River in the mountains north of Valdez, crews lowered the first stretch of pipeline into the ground beneath the river. 1,900 feet of pipe carried by 12 side-boom tractors moving in unison, each a crawler with a crane arm extending from its side, lifting the pipe like pallbearers. That date is no coincidence.

11 years earlier to the day, on March 27th, 1964, the Good Friday earthquake struck Alaska, and an underwater landslide carried the Valdez waterfront into the sea. 32 people died there. The entire town was relocated about 4 miles to safer ground. So the pipeline was built to end in a town already destroyed once by shifting ground, and the line itself had to cross that kind of ground, too.

North of the Alaska Range, the route crosses the Denali Fault, a crack in the earth where one side can jerk sideways past the other. You cannot prevent a fault from moving. So at the crossing, the engineers laid the pipe on long steel beams atop supports that would let it slide. Alyeska’s design figure was 20 feet sideways and 5 feet up or down without the pipe breaking.

Whether that figure was correct, nobody would know until the earth tested it. The test would come long after the last weld. By the summer of 1975, the pipeline had become dozens of jobs at once, spread across 800 miles, and the people doing them arrived from everywhere. Valdez felt it first.

In June of 1975, Time magazine reported that the town’s population had tripled to 3,600 in 17 months. A two-bedroom apartment that had rented for $286 a month was going for 1,600. Grocery shelves ran empty. Kids sat in makeshift classrooms.

Fairbanks was worse because Fairbanks was the gateway. Police officers there were earning $1,620 a month, and the pipeline was paying security guards $1,000 a week. So the officers quit and went to the pipeline. Time counted two state troopers left in the area out of 17 the state had authorized.

The same article found the cost of it in Fairbanks. A tent maker there had sold $45,000 worth of tents in 1972 and 240,000 the year before the article ran, because people arriving for the pipeline had nowhere else to sleep. The local rescue mission had 15 or 20 people sleeping on its floors most nights, and a crisis line got a call from a hungry 10-year-old whose mother and father had both gone off to work on the pipeline. The pay was real.

The same article listed what a journeyman welder grossed in an 184-hour week: $1,505. A camp handyman made $940 for 84 hours. That’s 12 hours a day, 7 days a week, and people lined up for it. Over a year, a typical worker on the line could make about $57,000, at a time when a member of Congress was paid $42,500.

The largest union involved in the project, Teamsters Local 959—representing truck drivers and camp workers—surpassed 23,000 members. A pipeline worker could earn more than a congressman. That gives you a sense of how desperately the nation wanted this oil and how few people were prepared to head up there and extract it. In October 1975, the work reached its peak.

According to Alyeska’s own figures, 28,072 people were on the job that month. They were housed in 29 camps spread along the route, the largest at Isabel Pass with 1,652 beds, the smallest at Sourdough with 112. Consider what Isabel Pass camp actually was: 1,652 beds in a mountain pass, over 3,000 feet up in the Alaska Range. Before the boom, Valdez didn’t have that many residents, and the entire camp existed for a single purpose—to be gone once the pipe was through.

Somewhere between 5 and 10 percent of the workers were women. Across the entire project, roughly 70,000 people worked on the line. And at the top of it all was Frank Moolin, the senior project manager. Every history of the job describes the same thing about him.

He pushed people hard. The project had a staggering array of contractors, unions, and camps, and Moolin’s task was to make all of it move within the short window when the ground and weather permitted. That window governed everything. In the far north, you can’t lay pipe whenever you please.

Some rivers can only be crossed when they’re frozen. The schedule was built around the ground itself. So here’s what the work looked like on the stretches where the pipe went up on legs. First, drill holes into frozen ground.

Alyeska’s fact book states the legs went 15 to 70 feet deep, depending on the soil, and stood about 60 feet apart along most of the line. Each hole had to be bored into soil that could be up to half ice and as hard as concrete in winter. Then set the leg, and on the legs that required them, the two ammonia tubes with their aluminum fins on top. Then a crossbeam between each pair of legs, and on the crossbeam, a shoe for the pipe to rest in.

And here’s the clever part. The shoe wasn’t bolted down. The pipe could slide within it. Recall the Yukon Bridge expanding and contracting by 2 feet.

Now imagine a steel pipe 800 miles long that might sit empty at 50 below one month and carry oil at well over 100 degrees the next. Steel that long with a temperature swing like that would try to expand by a distance you’d measure in miles across the whole line. If you bolted it in a straight line, it would rip itself off its supports. So they didn’t lay it straight.

On the elevated stretches, the pipe zigzags. From the air, it looks like someone drew it with an unsteady hand. But every bend is a place where the pipe can flex. When it heats up and expands, the zigzags get a little sharper and the pipe slides sideways in its shoes.

When it cools, they relax. It’s the same reason a garden hose laid out in loose curves can be pulled a little longer without kinking, while a hose stretched tight can’t. 78,000 legs went in that way, and for every leg, someone had to drill a hole, set a pipe, weld a crossbeam, and fit a shoe in places where the nearest town might be 200 miles away. Then there was the water.

Alyeska’s fact book counts 34 major river and stream crossings on the route, plus nearly 500 smaller ones. Each one was a spot where the pipe had to go under or over moving water. And moving water in Alaska doesn’t stay where you left it. Rivers up there braid and wander.

A channel that runs along one bank this summer can be cutting across the other bank next spring when the ice breaks up and comes down in slabs the size of houses. A pipe buried a few feet under a riverbed can find itself lying in the open a year later with the current and ice working on it. So the river crossings went deep, and the pipe in them was wrapped in concrete. The concrete wasn’t for strength.

It was for weight. An empty steel pipe 4 feet wide is mostly air, and in a river, air floats. The concrete jacket was there to hold the pipe down on the bottom. That works as long as everything goes to plan.

Keep that in mind, because on one river it didn’t. Then there were the animals. The route crossed the ranges of two caribou herds, the Central Arctic herd on the North Slope and the Nelchina herd in the Copper River country. And nobody knew for certain whether a herd would walk under a pipe on stilts or turn back from it.

So the elevated line was raised high enough in places for animals to pass beneath, and in other places the pipe dropped into the ground for a short stretch just so they could walk over it. Alyeska counts about 579 of these animal crossings along the main line, but some of those crossings were exactly where the ground was full of ice. In a few places, the engineers needed the pipe underground for a highway or for animals on ground that couldn’t take a warm pipe. So they did something that sounds backward.

They buried the pipe in insulation and then refrigerated the ditch. At those spots, refrigeration plants run chilled brine through loops of 6-inch pipe laid in the ground beside the oil line like the cooling coils in the back of a freezer. Two of the animal crossings north of Valdez are built that way. So is the crossing under the Glenn Highway at Glennallen.

Think about that for a moment. To carry hot oil past a herd of caribou, they built a refrigerator in the ground and put the oil pipe inside it. All of this—the legs and the zigzags and the frozen ditches—had to be finished on a deadline the whole country was watching. October 1975 had two dates in it that Alyeska still lists.

The first came early in the month. The Yukon River Bridge, the one whose cofferdam had failed the summer before, was finished. On October 10th, there was a ceremony on it, and the haul road was now tied to the rest of Alaska across the biggest river in the state. Alyeska’s president during the construction was Edward Patton, and the bridge carries his name today.

That bridge took 17 months from the first work in the river to the ceremony, and one of those months was spent watching a cofferdam fail and starting again. For the people building the rest of the line, it meant something simple. For the first time, a pipeline truck could drive from Fairbanks to the Arctic Ocean without waiting for the river to freeze. The second came on October 26th.

That day Alyeska declared the project halfway finished. Halfway, in October, with winter closing in. And the half still ahead was the difficult half. The easy, level ground close to the camps had been tackled first.

What was left were the mountain passes, the canyons, and the endless frozen stretches of the Brooks Range. The strategy for that second half rested on one principle. Among the sayings you come across in accounts of the job is this: you start this pipeline once and it stays on forever. The oil would flow in, the pipe would fill, and from that moment it could never be permitted to stop, since hot oil that halts inside an Arctic pipe begins to cool, and cold crude thickens.

Keep that in mind as well, because on the day the oil was switched on, it would stop more than once. The legs were only the foundation. The pipe itself was still arriving, and it arrived in pieces. Every section of pipe shipped from Japan measured 40 or 60 feet, more than 100,000 of them in all.

In Fairbanks, welders paired them up into double joints, 42,000 of those, so the trucks could carry longer lengths up the line. Out in the field, crews welded those lengths together end to end. Alyeska tallies 66,000 of those field welds. The welders belonged mostly to Pipeliners Local 798 out of Tulsa, Oklahoma, and the pipe was their entire world.

One description of them in the construction histories reads, “Take your typical 798 pipeline welder, feed him a few drinks, and he’ll probably tell you he’s God’s greatest gift to welding. ”

The steel they welded varied, too. Along about 466 miles, the pipe wall measured just under half an inch thick, and for the remaining 334 miles it was heavier, a little over half an inch, wherever the line required extra strength. Every weld was meant to be x-rayed.

A film was exposed through the joint. The film was examined, and any weld with a flaw was cut out and redone. That is how you know a pipe will contain hot oil under pressure for decades. That summer, the x-rays began to lie.

The firm handling the x-ray work was a subcontractor named Ketchbaw Industries. One of its employees, a Fairbanks man named Peter Kelly, would later testify before Congress about what he had witnessed. He said he had personally falsified roughly 30 x-rays and had seen others doing the same ahead of him and behind him. Films were doctored to show sound joints.

By Kelly’s account, it continued for about six weeks during the summer of 1975 across more than 70 miles of the pipeline. He gave the reason in one plain sentence. It was to keep Ketchbaw moving down the pipeline and keeping pace with its contract. The schedule again.

The same deadline that drove everything else had just pushed someone to fake the one test that mattered most. In September of 1975, a former Ketchbaw employee took the matter to court, and the story broke. Alyeska dismissed its x-ray contractor. Congress convened hearings, and suddenly everyone was asking the same question.

How many of the welds already in the ground were sound? Alyeska returned to a 150-mile stretch and inspected it, finding that 8 percent of the manual welds there had defects. The federal government ordered an independent review of the records for every weld completed that year, 30,800 of them. Of those, 3,955 came back questionable.

That is roughly one weld in eight from the entire year. Each one a spot where hot crude was supposed to be held in by a joint nobody could vouch for. Now consider where those welds were. Many of them were not up on legs within easy reach.

They were in ditches, beneath river crossings, already covered over. In the stretch Alyeska rechecked first, there were 3,748 welds, and about two-thirds of them were already buried underground. Alyeska went back for every single one. They worked through the x-ray records weld by weld.

Where a film was missing or doubtful, and the weld lay underground, the weld had to be examined again, and that meant getting to it. Where the check failed, it meant cutting out the joint and starting over. By September of 1976, more than 3,000 of the questionable welds had been redone or cleared as safe. The repairs ran to about $55 million.

Six weeks of faked film had become a year of moving backward. And that year, 1976, was meant to be the year the line was completed. Frank Moolin had set the target himself. He told the press that the entire line would be installed, insulated, and hydro-tested by November 1st.

Then he conceded the flaw in that promise with a sentence the construction history still cites. “In some areas,” he said, “we did eat our cake last year. ” He meant the easy ground was gone. Everything remaining was the kind of terrain that had halted the Hickel road and turned back the Manhattan, and now a deadline hung over it.

That was the summer Diane Shanker joined the line. She was 21, fresh out of Reed College, living in Fairbanks with no construction background whatsoever. She had heard a rumor that the welders union, the same Local 798, was being compelled to hire women. So she walked into the union office and persuaded the office manager to send her out.

They assigned her to an all-male welding crew, mostly men from the South, as a welder’s helper. Her first task was to crawl on her hands and knees beneath the pipe and gather up the stubs of spent welding rod the welders dropped. When she was promoted to grinding the welds, her crew threatened to walk off, claiming it was too dangerous for a woman. One day the crew agreed not to speak to her at all.

That lasted about 4 hours. Another time, a man on the crew threw her into the water after she had told them she couldn’t swim. He was gone from the camp immediately. She stayed.

Years afterward, she told an interviewer that the work wasn’t the hard part. She said she had carried more weight on a tray waiting tables than she ever had to carry on that job. When she had worked enough hours to earn her union card, she was refused and warned she would be fired on the spot if she kept pushing. She later testified in a federal discrimination case against the union.

She is retired now, living in Anchorage. The welds on this pipe were ground smooth, in part, by a 21-year-old who had been told she would never get her card. Up at the northern end of the line, the work never paused for winter, because on the North Slope, winter is when the ground is at its best. Alyeska’s fact book describes that country plainly.

An open, treeless expanse stretching from the base of the Brooks Range all the way to the Arctic Ocean. During winter, for 56 straight days, the sun stays below the horizon. The mercury plunges to 60 below, and when the wind blows, it can feel like 135 below. Around midday there is a sort of lingering dusk, and according to the fact book, it provides enough light to drive without headlights.

Now imagine a welding crew out there at noon in December, in that blue half-light, working inside a small shelter draped over the joint to shield the arc from the wind. Hot metal at 60 below. Each weld must cool gradually and uniformly, or the cold will crack it. Then summer arrives, and that same plain becomes a swamp.

The upper layer thaws, water cannot drain through the frozen ground beneath it, and the entire slope transforms into a spread of ponds and mud that swallows a boot. Heavy equipment chews it up. That is why the gravel road and the gravel work pad were so essential. Alyeska lists the work pad along the line as 790 miles long.

A gravel shelf running nearly the entire distance from Prudhoe to Valdez, so the machines would never have to come into contact with the tundra. 790 miles of gravel put down solely to avoid touching the ground. That is how seriously they regarded what had happened to the Hickel Road. And on that same North Slope, in the summer of 1976, one of those welded sections came loose.

June of 1976, on the Sagavanirktok River, the Sag, as everyone called it. A stretch of concrete-coated pipe 1,700 feet long had been placed in a trench beneath the river. Recall what the concrete was for. Weight, to keep the pipe on the bottom.

It rose regardless. 1,700 feet of pipe drifted to the surface of the river. That is roughly a third of a mile of steel and concrete resting on top of the water where it had been buried. And the crews were working against a deadline.

The environmental regulations allowed them a 24-hour window to work in that river. They got the pipe back down and repaired it in 4 hours. 4 hours for a pipe the length of five football fields that had just floated out of a river in the Arctic. But the Sag was flat country.

The mountains were still ahead, and the mountains had their own deadlines. At the south end, the oil needed somewhere to go, and in 1976, the marine terminal at Valdez was being built across the bay from the new town. It would cost about 1.4 billion dollars on its own, nearly a fifth of the entire project.

Tankers would dock there to load the oil. One of the loading berths was constructed as a floating platform with 13 buoyancy chambers, and it weighed 6 and a half million pounds. They designed it to float because the ground beneath Valdez had already demonstrated, in 1964, what it could do to anything built on it. In between, the toughest terrain on the entire route still stood in the way.

Begin with Keystone Canyon, just outside Valdez, where the pipe rises from the coast through a narrow gorge with rock walls on both sides. The winter before, more than 300 inches of snow fell there. That is 25 feet. Portions of the work in Keystone were so steep that pipe had to be brought in by helicopter.

Out on the line, the men who had to make it work were in the cabs. One description of what a sideboom operator required stated that he must be able to sit on a sideboom at 40 below and not freeze up. The sideboom tractors were the backbone of the job. A crawler with a crane arm on its side, lifting a section of pipe that weighs tons, while three or four others lift the same section a few dozen feet down the line, all of them inching forward together over ice.

Then Thompson Pass, the final mountain wall before the sea. Alyeska’s fact book lists the steepest grade on the whole route there, 145 percent. Fifty-five degrees. Say that out loud, and it sounds like a mistake.

A grade is how far you climb for every 100 feet you go forward. A 100 percent grade means you climb 100 feet for every 100 feet, which is a 45-degree slope, the angle of a steep roof. 145 percent means you climb 145 feet for every 100 you move forward. The ground is closer to a wall than a hillside, and the pipe had to go straight up it, 4 feet wide, in sections that weighed tons, with every weld on it x-rayed, and this time the films were going to be real.

You cannot drive a sideboom up a slope like that. And at the north end, in the Brooks Range, there was Atigun Pass, the highest point on the line at 4,739 feet. Atigun presented the opposite problem from the rivers. The pass was full of permafrost and glacial soil, so the pipe should have gone up on legs.

But Atigun is avalanche country. A pipe on legs in that pass would be swept away by the first big slide. So they put it on the ground, in a way only this job would think of. They built a concrete box about 6,000 feet long and lined it with 21 inches of Styrofoam.

The hot pipe went inside the box. The insulation kept its heat from the frozen ground, and the concrete kept the mountain off the pipe. And the box had to be closed before the snow. In Atigun, that meant October.

If the snow came first, the season was gone, and the pass would sit open all winter. They closed it in time, which sounds like a small sentence until you remember that if they hadn’t, a half-finished trench full of pipe would have sat open at the top of the Brooks Range all winter, under avalanches, while every other part of the line waited on it. November 1st came, Moolin’s date. The line was not done.

The last section of pipe went in on December 6th, 1976, near Thompson Pass on that same mountain wall. At least 5 weeks late, and with the pipe finally in the ground from end to end, the people who had built it faced the only question that had ever mattered. Would the ground hold once the oil was hot inside it? The final weld was made on May 31st, 1977, near pump station 3.

And 3 weeks later, they found out. June 20th, 1977, pump station 1 at Prudhoe Bay. At 10:26 in the morning, Alaska time, the oil went into the pipe. It didn’t go in alone.

In front of it, the crews ran a cleaning plug through the line, and ahead of the oil they sent pressurized nitrogen gas, so that no leftover test water would pool in front of the crude and freeze. The oil came behind the nitrogen. And at the front, the oil was hardly moving. It was pressing into 800 miles of cold, empty steel, and the steel drew the heat right out of it.

One description of the startup reports that the oil initially had a viscosity much like asphalt. A figure in Alyeska’s fact book explains why this took so long. Before even one barrel could reach Valdez, the pipe had to be filled from one end to the other. The fact book refers to this as the line fill and lists it at slightly more than 9 million barrels.

9 million barrels of oil went into the pipe just to fill it, before anyone saw a drop at the far end. So the leading edge of the oil crept south. Prudhoe to Valdez would take 31 days. That works out to a bit over a mile an hour, roughly the speed of a slow walk.

Anyone strolling alongside that leading edge of oil, if a person could have walked that country, would have matched its pace for most of the journey. Alyeska still keeps the log of that run, station by station, down to the minute, and it reads like a race against a clock no one could see. The oil front reached pump station 3 on June 24th at 4 minutes before 1 in the afternoon. Pump station 4 the following morning at 10 minutes before 8.

By now it was climbing toward the Brooks Range, toward Atigun, and with every mile it traveled, it was filling cold steel that had stood empty all winter. Pump station 5, June 28th at 23 minutes past 6 in the morning. Pump station 6, July 1st at 6:30 in the evening. Remember what the plan said.

You start this pipeline once and it stays on forever. Three days later, it stopped. July 4th, 1977. Close to milepost 489, just north of pump station 8, crews discovered nitrogen leaking from the line ahead of the oil front.

The flow was shut down. When they opened the pipe, they learned why, and it’s the coldest detail in this entire story. The nitrogen being pushed ahead of the oil had been supercooled. It had cracked the steel.

A section of pipe and an elbow fitting had split from the cold of the gas that was meant to protect them. They cut it out and installed new pipe. The pipe built to withstand the Arctic had been cracked from within by cold the builders had sent through it themselves. They got it moving again.

At 24 minutes past 9 on the night of July 7th, the oil front reached pump station 8. Pump station 8 sits roughly 17 miles southeast of Fairbanks. Its job was to drive the oil onward toward the Alaska Range. The next day, the crews there were bringing it online for the first time.

At 2:38 in the afternoon on July 8th, pump station 8 exploded. The line continued without it. On July 19th, a piece of heavy equipment struck the line at a check valve, and 1,800 barrels of oil spilled. Another repair, another restart.

After that, the front began moving station to station once more. Pump station 9, July 20th, at 23 minutes before 11 in the morning. Pump station 10, July 22nd, at quarter to 5 in the morning. Pump station 12, the last one before the sea, July 26th, at 12 minutes before 4 in the morning.

By that point, Alyeska counted 32 workers who had died building this pipeline. The cost had risen from the 900 million dollars the oil companies had discussed in 1969 to about 8 billion. Every one of those numbers was riding on that line that summer, inside a single slow column of oil making its way south through the mountains. It crossed the Denali Fault on its sliding beams.

It rose through Isabel Pass at 3,420 feet and descended the Copper River country past Glennallen, through the refrigerated crossing beneath the highway, and on toward the coast. It passed over Thompson Pass, down the slope steeper than a roof, and into Keystone Canyon. July 28th, 1977. At the marine terminal in Valdez, the town that had been relocated after the earthquake, the oil emerged from the end of the pipe at 2 minutes past 11 at night.

It came out at 45 degrees. The pipe had drawn off most of its heat over the long cold journey. Only in the weeks that followed, as more warm oil kept arriving behind it, did the steel and the oil settle into balance. And along the entire 800 miles behind it, the ground beneath the stilts was still frozen.

The legs stood where they had been placed. The zigzags were sliding in their shoes exactly as they had been drawn. Nothing had sunk. The hot pipe had crossed ground that turns to mud, and the ground had held because the pipe had never truly touched it.

Four days after the oil arrived, on August 1st, the tanker Arco Juno sailed out of Valdez carrying the first load of North Slope crude, and the pipeline has been running ever since. At its peak, it was designed to carry a little over 2 million barrels a day. Today, it moves roughly 470,000. Of the 12 pump stations in the original design, one was never built, and only four still pump oil.

You can drive nearly the entire route. Begin in Fairbanks and head north on the Elliott Highway to Livengood. That’s where the gravel ended in 1968 and where the Hickel Road crews turned off into the tundra. From there, the Dalton Highway takes over.

It’s the haul road, the one built in 154 days, and the pipe runs alongside it for most of the distance. Fifty-seven miles up, you reach the Yukon River and drive across the Patton Bridge. Look for the pipe hanging beside the deck. In winter, that entire bridge is almost 2 feet shorter than it is in July.

Continue north and you cross the Arctic Circle. Not far beyond it, near where Prospect Creek meets the Jim River, is the site of the camp where someone recorded 80 below on a January day in 1971. Little remains there now. That number is still the record.

Then the Brooks Range. Somewhere along this stretch, the trees thin out, and the pipe, raised on its legs beside the road, begins to look exactly as it does from the air, a silver line in a zigzag, rising and falling over every swell of ground. Then the climb up Atigun Pass to 4,739 feet, and the pipe disappears at the top. It’s down there beneath the road, sealed in its concrete box, with its 21 inches of foam holding the mountain off it the way it was built to in the fall of 1976.

That box is also where the ground delivered its one real verdict. In June of 1979, two years after the oil began to flow, the buried pipe at Atigun Pass shifted, and Alyeska’s log notes 1,500 barrels spilled there. Five days later, the same thing struck far to the south near milepost 734, and 4,000 barrels escaped. At both sites, the pipe lay underground.

The legs in the air had held firm. Where the pipe was buried, the ground had located it. North of the pass, the trees end, and the pipe stretches out over the open North Slope on its legs toward Prudhoe Bay. In winter, you’ll watch the steel curving off to the horizon in its long zigzag, with the aluminum fins atop most of the legs standing against the sky.

Now head south instead, toward the sea. Down the Richardson Highway, the pipe crosses the Alaska Range through Isabel Pass, where the largest camp on the line once stood. Just north of it, on November 3rd, 2002, the Denali Fault did exactly what the engineers had anticipated. A magnitude 7.

9 earthquake, the biggest on the Denali Fault since at least 1912, shifted the ground along the fault roughly 18 feet sideways and two and a half feet upward. The pipe had been built to withstand 20 feet and 5. It slid on its beams. Alyeska replaced some damaged supports afterward, and the pipe never ruptured.

The engineers who designed that crossing had guessed right a quarter of a century before the ground put them to the test. Past Glennallen, you’re on the stretch where the pipe runs underground through refrigerated ground. Then the Tonsina River, where the first 1,900 feet went in on March 27th, 1975. Then Thompson Pass at 2,812 feet, where the final section of the line was laid that December on a slope you’d need your hands to climb.

Then down through Keystone Canyon between the rock walls, where the snow lay 25 feet deep the winter they built it. And then Valdez, the new town 4 miles from the old one, with the terminal across the water where the oil emerged at 2 minutes past 11 on a July night. Tankers still tie up at the berths there. On a clear day, you can look past them down Valdez Arm toward Prince William Sound.

The water every load of North Slope oil has passed through since that summer. Now return to those legs on the North Slope one more time. On any night in January, when it’s 40 below up there, inside each of those legs, the ammonia is boiling up out of the ground and handing its heat to the sky, drawing the cold down into the earth just as it did the first winter after the oil arrived. Nobody switches them on in the fall.

Every winter since 1977, 61,000 of those legs have been freezing the ground beneath a river of hot oil, so that the ground never learns the oil is there.

Related Posts

In 1900, guests at the Holloway Hotel in Newton County, Arkansas, kept vanishing from the same three rooms on the eastern wing. Seamstress Mary Carver left her sewing kit behind. Bible salesman…

The scratching started again around midnight, constant now, and Mary Ellis knew she would not sleep. She lay in her narrow room at the end of the third-floor corridor and listened to the sound working its way up through the building’s bones, a rhythmic scrape, scrape, scrape that came from somewhere below the floorboards. Mr. … Read more

In the 1980s, a high school rumor could travel through an entire building by lunchtime without a single text, group chat, or post. Someone whispered “after school, by the bleachers,” and the whole…

The whole school was already there by the time the circle closed. No one had sent a single message, no group chat existed, no one had posted anything anywhere, yet by lunchtime everyone knew the fight would happen after last bell, next to the bleachers. That was how news traveled then: whispered from locker to … Read more

In 1950, Roy Cox spent eight months building a tiny engine from scratch, holding tolerances of 25 millionths of an inch—any piston that deviated went straight in the trash. The Cox 049, a working…

The sound carried three backyards on a Saturday morning without even trying. Thin and slightly wrong, like something spinning faster than it had any right to. If you grew up anywhere in America between 1955 and 1985, you knew exactly what it was. It was the Cox 049, a working internal combustion engine machined to … Read more

In November 1909, authorities in Shannon County, Missouri, entered the Warren homestead and found the beds made, the pantry stocked, and a half-written letter on Thomas Warren’s desk. Thomas and…

Idaho Press-Tribune, October 17, 1907—that was the date stamped on the clipping, but the story itself was older, and stranger, and it began long before the newspaper ever touched it. It began, as so many things do, in the dark of a Missouri autumn. In the autumn of 1909, when the leaves turned copper and … Read more

In March 1923, Clarence Saunders cornered Wall Street itself. Working through a broker and southern banks, the Memphis grocer quietly bought nearly ev…

In the summer of 1923, on a hill at the eastern edge of Memphis, a half-finished mansion of pink Georgia marble rose against the sky. The man who ordered every stone placed there walked to the gate, handed the keys to his creditors, and never lived in the house. His name was Clarence Saunders, and … Read more

In 1848, Samuel Knap’s men dug 18 feet into a filled-in pit near Michigan’s Ontonagon River and struck a single mass of nearly pure copper—six tons of it. But the copper wasn’t lying on the floor….

The copper tool came out of a mining pit in Michigan and went to a laboratory. The lab returned a date of 8,500 years old. Hold that number, because it breaks something. That tool was already ancient when the first pyramid in Egypt was still only an idea in someone’s head. It was already old … Read more